IAC logo
IAC Assessment: SD0166
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0166
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1997
Principal Product Ball Point Pens and Refills
NAICS n/a
SIC 3951 - Pens And Mechanical Pencils
Sales $50,000,000-$100,000,000
# of Employees 150
Plant Area (Sq.Ft.) 240,000
Annual Production 84,000,000 Pieces
Production Hrs. Annual 2,120
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $176,035 3,089,684 kWh $0.06
Electricity Demand $81,617 10,992 kW-months/year $7.43
Natural Gas $3,062 457 MMBtu $6.70
TOTAL ENERGY COSTS $260,714
RECOMMENDED SAVINGS* $416,850 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,159
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Administrative Changes Electricity Usage Electricity Demand Other Liquid (non-haz) Administrative Changes
$ kWh $ kW-months/year $ gal $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,538
Cost:
$4,410
$1,585 27,843 $953 128 - - - - $1,585
27,843
kWh
$953
128
kW-months/year
-
-
gal
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,386
Cost:
$2,800
$1,028 18,171 $1,358 144 - - - - $1,028
18,171
kWh
$1,358
144
kW-months/year
-
-
gal
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,063
Cost:
$600
$717 6,448 $346 37 - - - - $717
6,448
kWh
$346
37
kW-months/year
-
-
gal
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,470
Cost:
$6,916
$1,502 26,377 $968 130 - - - - $1,502
26,377
kWh
$968
130
kW-months/year
-
-
gal
-
-
$
05: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$3,641
Cost:
$4,770
$2,206 38,687 $1,435 193 - - - - $2,206
38,687
kWh
$1,435
193
kW-months/year
-
-
gal
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,061
Cost:
$943
$1,224 21,395 $837 113 - - - - $1,224
21,395
kWh
$837
113
kW-months/year
-
-
gal
-
-
$
07: 3.7197 USE ULTRASONIC CLEANING Savings:
$31,800
Cost:
$2,000
- - - - $31,800 8,109 - - -
-
kWh
-
-
kW-months/year
$31,800
8,109
gal
-
-
$
08: 3.5112 REPROCESS SPENT OILS ON SITE FOR RE-USE Savings:
$491
Cost:
-
- - - - $491 63 - - -
-
kWh
-
-
kW-months/year
$491
63
gal
-
-
$
09: 4.5210 CLEAR AND RENT EXISTING SPACE Savings:
$370,400
Cost:
$53,750
- - - - - - $370,400 - -
-
kWh
-
-
kW-months/year
-
-
gal
$370,400
-
$
TOTAL RECOMMENDED Savings:
$416,850
Cost:
$76,189
$8,262 138,921 $5,897 745 $32,291 8,172 $370,400 - $8,262
138,921
kWh
$5,897
745
kW-months/year
$32,291
8,172
gal
$370,400
-
$
TOTAL IMPLEMENTED Savings:
$14,159
Cost:
$20,439
$8,262 138,921 $5,897 745 - - - - $8,262
138,921
kWh
$5,897
745
kW-months/year
-
-
gal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Administrative Changes Electricity Usage Electricity Demand Other Liquid (non-haz) Administrative Changes