Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 1997 |
Principal Product | Plastic bags, shipping sacks, shipping envelopes and polyeth |
NAICS | n/a |
SIC | 2673 - Bags: Plastics, Laminated, & Coated |
Sales | $10,000,000-$50,000,000 |
# of Employees | 130 |
Plant Area (Sq.Ft.) | 37,000 |
Annual Production | 14,000,000 Pounds |
Production Hrs. Annual | 8,640 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $341,244 | 6,851,114 | kWh | $0.05 |
Electricity Demand | $192,003 | 11,563 | kW-months/year | $16.60 |
Natural Gas | $7,412 | 1,184 | MMBtu | $6.26 |
TOTAL ENERGY COSTS | $540,659 | |||
RECOMMENDED SAVINGS* | $172,586 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $120,732 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $23,299 Cost: $26,840 |
$15,946 | 318,875 | $7,353 | 443 | - | - | - | - | - | - |
$15,946 318,875 kWh |
$7,353 443 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,867 Cost: $400 |
$1,962 | 39,273 | $905 | 55 | - | - | - | - | - | - |
$1,962 39,273 kWh |
$905 55 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $51,854 Cost: $28,000 |
$39,600 | 792,204 | $16,434 | 990 | $(-4,180) | (-663) | - | - | - | - |
$39,600 792,204 kWh |
$16,434 990 kW-months/year |
$(-4,180) (-663) MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS |
Savings: $3,600 Cost: $7,000 |
- | - | - | - | - | - | - | - | $3,600 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$3,600 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $22,009 Cost: $19,050 |
$16,436 | 241,794 | $5,573 | 336 | - | - | - | - | - | - |
$16,436 241,794 kWh |
$5,573 336 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,642 Cost: $1,989 |
$3,162 | 63,306 | $1,480 | 89 | - | - | - | - | - | - |
$3,162 63,306 kWh |
$1,480 89 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP |
Savings: $618 Cost: $960 |
$317 | 6,448 | $301 | 18 | - | - | - | - | - | - |
$317 6,448 kWh |
$301 18 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,790 Cost: $369 |
$1,115 | 22,274 | $675 | 41 | - | - | - | - | - | - |
$1,115 22,274 kWh |
$675 41 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $15,300 Cost: $5,500 |
- | - | - | - | - | - | - | - | $15,300 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$15,300 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $5,900 Cost: $9,000 |
- | - | - | - | - | - | - | - | $5,900 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$5,900 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.7134 WASH AND REUSE RAGS ON-SITE |
Savings: $2,920 Cost: $500 |
- | - | - | - | - | - | $2,920 | 9,984 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$2,920 9,984 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES |
Savings: $3,467 Cost: - |
- | - | - | - | - | - | - | - | $3,467 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$3,467 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $34,320 Cost: $350 |
- | - | - | - | - | - | - | - | $34,320 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$34,320 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $172,586 Cost: $99,958 |
$78,538 | 1,484,174 | $32,721 | 1,972 | $(-4,180) | (-663) | $2,920 | 9,984 | $62,587 | - | $78,538 1,484,174 kWh |
$32,721 1,972 kW-months/year |
$(-4,180) (-663) MMBtu |
$2,920 9,984 lb |
$62,587 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $120,732 Cost: $71,958 |
$38,938 | 691,970 | $16,287 | 982 | - | - | $2,920 | 9,984 | $62,587 | - | $38,938 691,970 kWh |
$16,287 982 kW-months/year |
- - MMBtu |
$2,920 9,984 lb |
$62,587 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Administrative Changes |