Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 1997 |
Principal Product | Aerospace safety equipment; mechanical flight control compon |
NAICS | n/a |
SIC | 3728 - Aircraft Parts And Equipment, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 160 |
Plant Area (Sq.Ft.) | 95,000 |
Annual Production | 219,000 Pounds |
Production Hrs. Annual | 4,674 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $164,075 | 2,326,495 | kWh | $0.07 |
Electricity Demand | $47,582 | 5,726 | kW-months/year | $8.31 |
Natural Gas | $2,757 | 437 | MMBtu | $6.31 |
TOTAL ENERGY COSTS | $214,414 | |||
RECOMMENDED SAVINGS* | $88,960 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $79,447 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,269 Cost: $940 |
$914 | 12,603 | $355 | 33 | - | - | - | - | - | - | - | - |
$914 12,603 kWh |
$355 33 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $5,192 Cost: $4,200 |
$5,192 | 73,271 | - | - | - | - | - | - | - | - | - | - |
$5,192 73,271 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $4,767 Cost: $5,600 |
$4,485 | 63,306 | $282 | 34 | - | - | - | - | - | - | - | - |
$4,485 63,306 kWh |
$282 34 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $3,093 Cost: $6,000 |
$1,295 | 18,171 | $1,894 | 228 | $(-96) | (-15) | - | - | - | - | - | - |
$1,295 18,171 kWh |
$1,894 228 kW-months/year |
$(-96) (-15) MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,239 Cost: $8,727 |
$3,260 | 46,014 | $979 | 118 | - | - | - | - | - | - | - | - |
$3,260 46,014 kWh |
$979 118 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP |
Savings: $8,038 Cost: $12,145 |
$5,590 | 78,839 | $2,448 | 295 | - | - | - | - | - | - | - | - |
$5,590 78,839 kWh |
$2,448 295 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $2,285 Cost: $902 |
$1,545 | 21,688 | $740 | 89 | - | - | - | - | - | - | - | - |
$1,545 21,688 kWh |
$740 89 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $6,420 Cost: - |
- | - | - | - | - | - | $6,420 | 300 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$6,420 300 gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $4,420 Cost: - |
- | - | - | - | - | - | - | - | $4,420 | 110,000 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$4,420 110,000 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $3,341 Cost: $2,000 |
- | - | - | - | - | - | - | - | - | - | $3,341 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
$3,341 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 4.421 MODIFY CURRENT INCENTIVE PROGRAM |
Savings: $4,675 Cost: $4,800 |
- | - | - | - | - | - | - | - | - | - | $4,675 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
$4,675 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $41,221 Cost: $200 |
- | - | - | - | - | - | - | - | - | - | $41,221 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
$41,221 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $88,960 Cost: $45,514 |
$22,281 | 313,892 | $6,698 | 797 | $(-96) | (-15) | $6,420 | 300 | $4,420 | 110,000 | $49,237 | - | $22,281 313,892 kWh |
$6,698 797 kW-months/year |
$(-96) (-15) MMBtu |
$6,420 300 gal |
$4,420 110,000 lb |
$49,237 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $79,447 Cost: $39,514 |
$20,986 | 295,721 | $4,804 | 569 | - | - | - | - | $4,420 | 110,000 | $49,237 | - | $20,986 295,721 kWh |
$4,804 569 kW-months/year |
- - MMBtu |
- - gal |
$4,420 110,000 lb |
$49,237 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes |