Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 1997 |
Principal Product | Multi-layer printed circuit boards |
NAICS | n/a |
SIC | 3672 - Printed Circuit Boards |
Sales | $10,000,000-$50,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 82,000 |
Annual Production | 0 Pieces |
Production Hrs. Annual | 7,803 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $410,023 | 5,746,190 | kWh | $0.07 |
Electricity Demand | $107,968 | 14,246 | kW-months/year | $7.58 |
Natural Gas | $60,447 | 26,769 | MMBtu | $2.26 |
TOTAL ENERGY COSTS | $578,438 | |||
RECOMMENDED SAVINGS* | $148,371 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $122,797 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $6,578 Cost: $9,930 |
$5,027 | 70,926 | $1,551 | 205 | - | - | - | - | - | - | - | - |
$5,027 70,926 kWh |
$1,551 205 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1224 REPLACE BOILER |
Savings: $19,420 Cost: $83,000 |
- | - | - | - | $19,420 | 8,444 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$19,420 8,444 MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $6,154 Cost: $3,900 |
- | - | - | - | $6,154 | 2,674 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$6,154 2,674 MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $3,056 Cost: $2,170 |
- | - | - | - | $3,056 | 1,329 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,056 1,329 MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $1,916 Cost: $720 |
- | - | - | - | $1,916 | 833 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,916 833 MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $4,318 Cost: $6,500 |
$2,893 | 40,739 | $1,425 | 188 | - | - | - | - | - | - | - | - |
$2,893 40,739 kWh |
$1,425 188 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,228 Cost: $13,068 |
$5,418 | 76,202 | $810 | 107 | - | - | - | - | - | - | - | - |
$5,418 76,202 kWh |
$810 107 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP |
Savings: $17,960 Cost: $11,180 |
$15,559 | 219,226 | $2,401 | 317 | - | - | - | - | - | - | - | - |
$15,559 219,226 kWh |
$2,401 317 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.6112 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME |
Savings: $4,758 Cost: $3,000 |
- | - | - | - | - | - | - | - | $4,758 | 116,000 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$4,758 116,000 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE |
Savings: $5,045 Cost: - |
- | - | - | - | - | - | - | - | - | - | $5,045 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
$5,045 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.4115 RECOVER AND REUSE COOLING WATER |
Savings: $3,300 Cost: $2,000 |
- | - | - | - | - | - | $3,300 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$3,300 - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 4.444 INSTALL SYSTEM TO COLLECT SCRAP |
Savings: $69,638 Cost: $20,000 |
- | - | - | - | - | - | - | - | - | - | $69,638 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
$69,638 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $148,371 Cost: $155,468 |
$28,897 | 407,093 | $6,187 | 817 | $30,546 | 13,280 | $3,300 | - | $4,758 | 116,000 | $74,683 | - | $28,897 407,093 kWh |
$6,187 817 kW-months/year |
$30,546 13,280 MMBtu |
$3,300 - gal |
$4,758 116,000 lb |
$74,683 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $122,797 Cost: $68,568 |
$28,897 | 407,093 | $6,187 | 817 | $4,972 | 2,162 | $3,300 | - | $4,758 | 116,000 | $74,683 | - | $28,897 407,093 kWh |
$6,187 817 kW-months/year |
$4,972 2,162 MMBtu |
$3,300 - gal |
$4,758 116,000 lb |
$74,683 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes |