IAC logo
IAC Assessment: SD0184
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0184
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1997
Principal Product Manufacture transducers
NAICS n/a
SIC 3679 - Electronic Components, Nec
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 94,000
Annual Production 35,000 Pieces
Production Hrs. Annual 4,250
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $151,388 2,929,367 kWh $0.05
Electricity Demand $76,565 7,666 kW-months/year $9.99
Natural Gas $5,740 999 MMBtu $5.75
TOTAL ENERGY COSTS $233,693
RECOMMENDED SAVINGS* $72,410 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,704
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ gal $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,327
Cost:
$150
$976 18,757 $351 37 - - - - - - $976
18,757
kWh
$351
37
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
02: 2.6224 SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS Savings:
$1,309
Cost:
-
$592 11,430 $717 72 - - - - - - $592
11,430
kWh
$717
72
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
03: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$2,049
Cost:
$2,500
- - - - $2,049 205 - - - - -
-
kWh
-
-
kW-months/year
$2,049
205
MMBtu
-
-
gal
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$551
Cost:
$150
$333 6,448 $218 23 - - - - - - $333
6,448
kWh
$218
23
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,528
Cost:
$8,640
$1,822 35,170 $706 71 - - - - - - $1,822
35,170
kWh
$706
71
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
06: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$15,269
Cost:
$18,810
$9,584 184,349 $5,685 570 - - - - - - $9,584
184,349
kWh
$5,685
570
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
07: 3.8224 CONVERT TO LESS TOXIC HYDROCARBON CLEANERS Savings:
$6,500
Cost:
-
- - - - - - $6,500 330 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,500
330
gal
-
-
$
08: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$2,877
Cost:
-
- - - - - - $2,877 616 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,877
616
gal
-
-
$
09: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$40,000
Cost:
$150,000
- - - - - - - - $40,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$40,000
-
$
TOTAL RECOMMENDED Savings:
$72,410
Cost:
$180,250
$13,307 256,154 $7,677 773 $2,049 205 $9,377 946 $40,000 - $13,307
256,154
kWh
$7,677
773
kW-months/year
$2,049
205
MMBtu
$9,377
946
gal
$40,000
-
$
TOTAL IMPLEMENTED Savings:
$10,704
Cost:
$150
$976 18,757 $351 37 - - $9,377 946 - - $976
18,757
kWh
$351
37
kW-months/year
-
-
MMBtu
$9,377
946
gal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Administrative Changes