IAC logo
IAC Assessment: SD0186
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0186
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1998
Principal Product Steel Office Cabinets
NAICS n/a
SIC 2522 - Office Furniture, Except Wood
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 120,000
Annual Production 3,000,000 Pieces
Production Hrs. Annual 5,050
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $159,168 2,339,390 kWh $0.07
Electricity Demand $47,854 5,418 kW-months/year $8.83
Natural Gas $116,715 21,392 MMBtu $5.46
TOTAL ENERGY COSTS $323,737
RECOMMENDED SAVINGS* $83,792 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,093
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,357
Cost:
$3,530
$762 11,137 $595 67 - - - - - - - - $762
11,137
kWh
$595
67
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,716
Cost:
-
$1,319 19,343 $397 45 - - - - - - - - $1,319
19,343
kWh
$397
45
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$5,665
Cost:
$1,180
- - - - $5,665 877 - - - - - - -
-
kWh
-
-
kW-months/year
$5,665
877
MMBtu
-
-
Tgal
-
-
lb
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,973
Cost:
$500
$2,288 33,705 $685 77 - - - - - - - - $2,288
33,705
kWh
$685
77
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$928
Cost:
$1,853
$611 9,086 $317 36 - - - - - - - - $611
9,086
kWh
$317
36
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
06: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$2,785
Cost:
$5,115
$1,768 22,567 $1,017 115 - - - - - - - - $1,768
22,567
kWh
$1,017
115
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
07: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$64,806
Cost:
$732
- - - - - - - - $64,806 23,145 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$64,806
23,145
lb
-
-
$
08: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$3,050
Cost:
$9,000
- - - - - - - - - - $3,050 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$3,050
-
$
09: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$512
Cost:
$450
- - - - - - $512 587,071 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$512
587,071
Tgal
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$83,792
Cost:
$22,360
$6,748 95,838 $3,011 340 $5,665 877 $512 587,071 $64,806 23,145 $3,050 - $6,748
95,838
kWh
$3,011
340
kW-months/year
$5,665
877
MMBtu
$512
587,071
Tgal
$64,806
23,145
lb
$3,050
-
$
TOTAL IMPLEMENTED Savings:
$11,093
Cost:
$19,998
$5,429 76,495 $2,614 295 - - - - - - $3,050 - $5,429
76,495
kWh
$2,614
295
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$3,050
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes