IAC logo
IAC Assessment: SD0189
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0189
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1998
Principal Product Commercial Refrigerants
NAICS n/a
SIC 2819 - Industrial Inorganic Chemicals, Nec
Sales $50,000,000-$100,000,000
# of Employees 100
Plant Area (Sq.Ft.) 1,000,000
Annual Production 75,000,000 Pounds
Production Hrs. Annual 8,652
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $563,423 12,332,063 kWh $0.05
Electricity Demand $196,085 18,795 kW-months/year $10.43
Natural Gas $5,700 705 MMBtu $8.09
TOTAL ENERGY COSTS $765,208
RECOMMENDED SAVINGS* $764,504 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,200
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$23,155
Cost:
$22,250
$17,254 375,147 $5,901 566 - - - - $17,254
375,147
kWh
$5,901
566
kW-months/year
-
-
MMBtu
-
-
$
02: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$543,061
Cost:
$1,420,250
$491,520 10,688,160 $154,572 14,820 $(-103,031) (-121,128) - - $491,520
10,688,160
kWh
$154,572
14,820
kW-months/year
$(-103,031)
(-121,128)
MMBtu
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,455
Cost:
$6,625
$1,692 36,928 $1,763 169 - - - - $1,692
36,928
kWh
$1,763
169
kW-months/year
-
-
MMBtu
-
-
$
04: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$678
Cost:
$219
$516 11,137 $162 16 - - - - $516
11,137
kWh
$162
16
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,587
Cost:
$5,358
$2,629 57,151 $958 92 - - - - $2,629
57,151
kWh
$958
92
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$4,788
Cost:
$5,180
$2,786 60,668 $2,002 192 - - - - $2,786
60,668
kWh
$2,002
192
kW-months/year
-
-
MMBtu
-
-
$
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$5,780
Cost:
$8,500
- - - - - - $5,780 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,780
-
$
08: 2.1223 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) Savings:
$180,000
Cost:
$27,000
- - - - $180,000 - - - -
-
kWh
-
-
kW-months/year
$180,000
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$764,504
Cost:
$1,495,382
$516,397 11,229,191 $165,358 15,855 $76,969 (-121,128) $5,780 - $516,397
11,229,191
kWh
$165,358
15,855
kW-months/year
$76,969
(-121,128)
MMBtu
$5,780
-
$
TOTAL IMPLEMENTED Savings:
$33,200
Cost:
$36,327
$20,399 443,435 $7,021 674 - - $5,780 - $20,399
443,435
kWh
$7,021
674
kW-months/year
-
-
MMBtu
$5,780
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes