IAC logo
IAC Assessment: SD0194
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0194
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1998
Principal Product PCB Containers, and Heat Sinks
NAICS n/a
SIC 3569 - General Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 80,000
Annual Production 75,000 Thousand Feet
Production Hrs. Annual 3,850
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $119,958 1,482,708 kWh $0.08
Electricity Demand $44,350 5,016 kW-months/year $8.84
Natural Gas $4,435 608 MMBtu $7.29
TOTAL ENERGY COSTS $168,743
RECOMMENDED SAVINGS* $40,490 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,374
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,625
Cost:
$5,210
$2,518 31,067 $1,107 125 - - - - $2,518
31,067
kWh
$1,107
125
kW-months/year
-
-
MMBtu
-
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$20,551
Cost:
$10,500
$17,963 221,864 $3,629 432 $(-1,041) (-189) - - $17,963
221,864
kWh
$3,629
432
kW-months/year
$(-1,041)
(-189)
MMBtu
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,430
Cost:
$450
$1,538 19,050 $892 101 - - - - $1,538
19,050
kWh
$892
101
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$706
Cost:
$1,150
$527 6,448 $179 20 - - - - $527
6,448
kWh
$179
20
kW-months/year
-
-
MMBtu
-
-
$
05: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$2,213
Cost:
$1,559
- - $561 64 $1,652 70 - - -
-
kWh
$561
64
kW-months/year
$1,652
70
MMBtu
-
-
$
06: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$3,975
Cost:
$7,590
$2,494 30,774 $1,481 168 - - - - $2,494
30,774
kWh
$1,481
168
kW-months/year
-
-
MMBtu
-
-
$
07: 3.5242 RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE Savings:
$2,400
Cost:
$1,000
- - - - - - $2,400 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,400
-
$
08: 3.2171 USE AN AUTOMATIC PLATE PROCESSOR Savings:
$4,590
Cost:
$1,000
- - - - - - $4,590 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,590
-
$
TOTAL RECOMMENDED Savings:
$40,490
Cost:
$28,459
$25,040 309,203 $7,849 910 $611 (-119) $6,990 - $25,040
309,203
kWh
$7,849
910
kW-months/year
$611
(-119)
MMBtu
$6,990
-
$
TOTAL IMPLEMENTED Savings:
$11,374
Cost:
$9,369
$4,583 56,565 $2,739 310 $1,652 70 $2,400 - $4,583
56,565
kWh
$2,739
310
kW-months/year
$1,652
70
MMBtu
$2,400
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes