Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 1998 |
Principal Product | PCB Containers, and Heat Sinks |
NAICS | n/a |
SIC | 3569 - General Industrial Machinery, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 180 |
Plant Area (Sq.Ft.) | 80,000 |
Annual Production | 75,000 Thousand Feet |
Production Hrs. Annual | 3,850 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $119,958 | 1,482,708 | kWh | $0.08 |
Electricity Demand | $44,350 | 5,016 | kW-months/year | $8.84 |
Natural Gas | $4,435 | 608 | MMBtu | $7.29 |
TOTAL ENERGY COSTS | $168,743 | |||
RECOMMENDED SAVINGS* | $40,490 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $11,374 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $3,625 Cost: $5,210 |
$2,518 | 31,067 | $1,107 | 125 | - | - | - | - |
$2,518 31,067 kWh |
$1,107 125 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $20,551 Cost: $10,500 |
$17,963 | 221,864 | $3,629 | 432 | $(-1,041) | (-189) | - | - |
$17,963 221,864 kWh |
$3,629 432 kW-months/year |
$(-1,041) (-189) MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $2,430 Cost: $450 |
$1,538 | 19,050 | $892 | 101 | - | - | - | - |
$1,538 19,050 kWh |
$892 101 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $706 Cost: $1,150 |
$527 | 6,448 | $179 | 20 | - | - | - | - |
$527 6,448 kWh |
$179 20 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $2,213 Cost: $1,559 |
- | - | $561 | 64 | $1,652 | 70 | - | - |
- - kWh |
$561 64 kW-months/year |
$1,652 70 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP |
Savings: $3,975 Cost: $7,590 |
$2,494 | 30,774 | $1,481 | 168 | - | - | - | - |
$2,494 30,774 kWh |
$1,481 168 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5242 RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE |
Savings: $2,400 Cost: $1,000 |
- | - | - | - | - | - | $2,400 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$2,400 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.2171 USE AN AUTOMATIC PLATE PROCESSOR |
Savings: $4,590 Cost: $1,000 |
- | - | - | - | - | - | $4,590 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$4,590 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $40,490 Cost: $28,459 |
$25,040 | 309,203 | $7,849 | 910 | $611 | (-119) | $6,990 | - | $25,040 309,203 kWh |
$7,849 910 kW-months/year |
$611 (-119) MMBtu |
$6,990 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $11,374 Cost: $9,369 |
$4,583 | 56,565 | $2,739 | 310 | $1,652 | 70 | $2,400 | - | $4,583 56,565 kWh |
$2,739 310 kW-months/year |
$1,652 70 MMBtu |
$2,400 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes |