IAC Assessment: SD0199
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0199
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1998
Principal Product Aerospace and automotive seals
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 60,000
Annual Production 500,000 Pieces
Production Hrs. Annual 5,200
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $153,880 1,527,257 kWh $0.10
Electricity Demand $37,018 4,191 kW-months/year $8.83
Natural Gas $3,158 442 MMBtu $7.14
TOTAL ENERGY COSTS $194,056
RECOMMENDED SAVINGS* $106,011 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,146
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,582
Cost:
$750
$1,247 16,413 $335 38 - - - - $1,247
16,413
kWh
$335
38
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,572
Cost:
$4,900
$1,589 20,809 $983 111 - - - - $1,589
20,809
kWh
$983
111
kW-months/year
-
-
MMBtu
-
-
$
03: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$2,756
Cost:
$1,182
- - - - $2,756 388 - - -
-
kWh
-
-
kW-months/year
$2,756
388
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,118
Cost:
$16,039
$4,574 60,082 $1,544 175 - - - - $4,574
60,082
kWh
$1,544
175
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$17,565
Cost:
$11,460
$13,622 179,367 $3,943 447 - - - - $13,622
179,367
kWh
$3,943
447
kW-months/year
-
-
MMBtu
-
-
$
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$4,118
Cost:
$8,500
- - - - - - $4,118 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,118
-
$
07: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$71,300
Cost:
-
- - - - - - $71,300 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$71,300
-
$
TOTAL RECOMMENDED Savings:
$106,011
Cost:
$42,831
$21,032 276,671 $6,805 771 $2,756 388 $75,418 - $21,032
276,671
kWh
$6,805
771
kW-months/year
$2,756
388
MMBtu
$75,418
-
$
TOTAL IMPLEMENTED Savings:
$17,146
Cost:
$31,371
$7,410 97,304 $2,862 324 $2,756 388 $4,118 - $7,410
97,304
kWh
$2,862
324
kW-months/year
$2,756
388
MMBtu
$4,118
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes