IAC logo
IAC Assessment: SD0200
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0200
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1998
Principal Product Furnaces, air handlers
NAICS n/a
SIC 3433 - Heating Equipment, Except Electric
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 360,000
Annual Production 103,000 Pieces
Production Hrs. Annual 2,168
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $199,696 2,630,715 kWh $0.08
Electricity Demand $59,644 9,260 kW-months/year $6.44
Natural Gas $111,515 23,134 MMBtu $4.82
TOTAL ENERGY COSTS $385,675
RECOMMENDED SAVINGS* $139,082 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $52,524
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$310
Cost:
$340
$310 4,103 - - - - - - - - - - $310
4,103
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$809
Cost:
$700
$551 7,327 $258 41 - - - - - - - - $551
7,327
kWh
$258
41
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,219
Cost:
$2,364
- - - - $1,219 254 - - - - - - -
-
kWh
-
-
kW-months/year
$1,219
254
MMBtu
-
-
Tgal
-
-
lb
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,197
Cost:
$10,200
$3,927 51,583 $2,270 352 - - - - - - - - $3,927
51,583
kWh
$2,270
352
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
05: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$2,402
Cost:
$2,820
$1,741 22,860 $661 103 - - - - - - - - $1,741
22,860
kWh
$661
103
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
06: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$13,838
Cost:
$7,475
- - - - $13,838 2,883 - - - - - - -
-
kWh
-
-
kW-months/year
$13,838
2,883
MMBtu
-
-
Tgal
-
-
lb
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,464
Cost:
$14,319
$9,034 118,992 $3,430 533 - - - - - - - - $9,034
118,992
kWh
$3,430
533
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
08: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$4,320
Cost:
$9,000
- - - - - - - - - - $4,320 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$4,320
-
$
09: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$480
Cost:
-
- - - - - - - - $480 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$480
-
lb
-
-
$
10: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$14,400
Cost:
-
- - - - - - $14,400 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$14,400
-
Tgal
-
-
lb
-
-
$
11: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$6,318
Cost:
-
- - - - - - - - $6,318 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$6,318
-
lb
-
-
$
12: 4.711 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM Savings:
$48,675
Cost:
$50,000
- - - - - - - - - - $48,675 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$48,675
-
$
13: 4.711 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM Savings:
$20,000
Cost:
-
- - - - - - - - - - $20,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$20,000
-
$
14: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$7,650
Cost:
$18,840
- - - - - - - - - - $7,650 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$7,650
-
$
TOTAL RECOMMENDED Savings:
$139,082
Cost:
$116,058
$15,563 204,865 $6,619 1,029 $15,057 3,137 $14,400 - $6,798 - $80,645 - $15,563
204,865
kWh
$6,619
1,029
kW-months/year
$15,057
3,137
MMBtu
$14,400
-
Tgal
$6,798
-
lb
$80,645
-
$
TOTAL IMPLEMENTED Savings:
$52,524
Cost:
$19,900
$4,478 58,910 $2,528 393 - - $14,400 - $6,798 - $24,320 - $4,478
58,910
kWh
$2,528
393
kW-months/year
-
-
MMBtu
$14,400
-
Tgal
$6,798
-
lb
$24,320
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Administrative Changes