Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1998
Principal Product Custom injection molding
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 78,000
Annual Production 3,000,000 Pounds
Production Hrs. Annual 8,569
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $127,539 2,752,931 kWh $0.05
Electricity Demand $90,519 6,011 kW-months/year $15.06
TOTAL ENERGY COSTS $225,648
RECOMMENDED SAVINGS* $261,643 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $178,605
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$83,038
Cost:
$163,750
$60,349 1,312,427 $22,689 1,507 - - - - - - $60,349
1,312,427
kWh
$22,689
1,507
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION Savings:
$5,837
Cost:
-
- - $5,837 388 - - - - - - -
-
kWh
$5,837
388
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$2,817
Cost:
$1,076
- - - - $2,817 210 - - - - -
-
kWh
-
-
kW-months/year
$2,817
210
MMBtu
-
-
Tgal
-
-
$
04: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$519
Cost:
$1,260
$222 4,689 $297 20 - - - - - - $222
4,689
kWh
$297
20
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,374
Cost:
-
$1,651 36,049 $723 48 - - - - - - $1,651
36,049
kWh
$723
48
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$3,218
Cost:
$8,500
- - - - - - $3,218 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,218
-
Tgal
-
-
$
07: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$6,426
Cost:
$1,275
- - - - - - - - $6,426 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$6,426
-
$
08: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$157,414
Cost:
$12,000
- - - - - - - - $157,414 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$157,414
-
$
TOTAL RECOMMENDED Savings:
$261,643
Cost:
$187,861
$62,222 1,353,165 $29,546 1,963 $2,817 210 $3,218 - $163,840 - $62,222
1,353,165
kWh
$29,546
1,963
kW-months/year
$2,817
210
MMBtu
$3,218
-
Tgal
$163,840
-
$
TOTAL IMPLEMENTED Savings:
$178,605
Cost:
$24,111
$1,873 40,738 $6,857 456 $2,817 210 $3,218 - $163,840 - $1,873
40,738
kWh
$6,857
456
kW-months/year
$2,817
210
MMBtu
$3,218
-
Tgal
$163,840
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Administrative Changes