IAC logo
IAC Assessment: SD0211
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0211
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1999
Principal Product nylon film
NAICS n/a
SIC 3081 - Unsupported Plastics Film & Sheet
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 120,000
Annual Production 2,400,000 Pounds
Production Hrs. Annual 7,200
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $178,557 2,657,972 kWh $0.07
Electricity Demand $52,024 6,368 kW-months/year $8.17
Natural Gas $6,404 1,031 MMBtu $6.21
TOTAL ENERGY COSTS $241,133
RECOMMENDED SAVINGS* $219,222 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $145,735
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Product
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$785
Cost:
-
$658 9,672 $127 16 - - - - - - $658
9,672
kWh
$127
16
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$10,261
Cost:
-
$7,651 114,009 $2,610 320 - - - - - - $7,651
114,009
kWh
$2,610
320
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$3,358
Cost:
$6,750
$2,545 37,808 $813 100 - - - - - - $2,545
37,808
kWh
$813
100
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$21,102
Cost:
$2,000
$17,548 261,137 $3,554 435 - - - - - - $17,548
261,137
kWh
$3,554
435
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$36,281
Cost:
$5,000
$44,876 667,937 $9,093 1,113 $(-17,688) (-2,848) - - - - $44,876
667,937
kWh
$9,093
1,113
kW-months/year
$(-17,688)
(-2,848)
MMBtu
-
-
lb
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,700
Cost:
$370
$1,438 21,395 $262 32 - - - - - - $1,438
21,395
kWh
$262
32
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$25,400
Cost:
$10,000
- - - - - - $25,400 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$25,400
-
lb
-
-
$
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$22,360
Cost:
$3,000
- - - - - - $22,360 49 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$22,360
49
lb
-
-
$
09: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$97,975
Cost:
-
- - - - - - - - $97,975 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$97,975
-
$
TOTAL RECOMMENDED Savings:
$219,222
Cost:
$27,120
$74,716 1,111,958 $16,459 2,016 $(-17,688) (-2,848) $47,760 49 $97,975 - $74,716
1,111,958
kWh
$16,459
2,016
kW-months/year
$(-17,688)
(-2,848)
MMBtu
$47,760
49
lb
$97,975
-
$
TOTAL IMPLEMENTED Savings:
$145,735
Cost:
$13,000
- - - - - - $47,760 49 $97,975 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$47,760
49
lb
$97,975
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $