IAC Assessment: SD0221
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0221
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1999
Principal Product aerospace composites
NAICS n/a
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $5,000,000-$10,000,000
# of Employees 70
Plant Area (Sq.Ft.) 54,000
Annual Production 2,000 Pieces
Production Hrs. Annual 4,080
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $79,543 1,038,687 kWh $0.08
Electricity Demand $34,550 3,671 kW-months/year $9.41
Natural Gas $5,550 982 MMBtu $5.65
TOTAL ENERGY COSTS $120,219
RECOMMENDED SAVINGS* $67,289 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,768
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Administrative Changes Electricity Usage Electricity Demand Other Liquid (haz) Administrative Changes
$ kWh $ kW-months/year $ gal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,177
Cost:
$3,752
$1,620 21,102 $557 59 - - - - $1,620
21,102
kWh
$557
59
kW-months/year
-
-
gal
-
-
$
02: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$3,218
Cost:
$3,060
$2,380 31,067 $838 89 - - - - $2,380
31,067
kWh
$838
89
kW-months/year
-
-
gal
-
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$50,303
Cost:
$11,995
$21,621 282,239 $28,682 3,048 - - - - $21,621
282,239
kWh
$28,682
3,048
kW-months/year
-
-
gal
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,107
Cost:
-
$425 5,569 $682 73 - - - - $425
5,569
kWh
$682
73
kW-months/year
-
-
gal
-
-
$
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$1,560
Cost:
$1,560
- - - - - - $1,560 - -
-
kWh
-
-
kW-months/year
-
-
gal
$1,560
-
$
06: 3.8211 CONVERT TO AQUEOUS CLEANING SYSTEM Savings:
$1,922
Cost:
$1,922
- - - - $1,922 114 - - -
-
kWh
-
-
kW-months/year
$1,922
114
gal
-
-
$
07: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$7,002
Cost:
-
- - $7,002 - - - - - -
-
kWh
$7,002
-
kW-months/year
-
-
gal
-
-
$
TOTAL RECOMMENDED Savings:
$67,289
Cost:
$22,289
$26,046 339,977 $37,761 3,269 $1,922 114 $1,560 - $26,046
339,977
kWh
$37,761
3,269
kW-months/year
$1,922
114
gal
$1,560
-
$
TOTAL IMPLEMENTED Savings:
$13,768
Cost:
$7,234
$2,045 26,671 $8,241 132 $1,922 114 $1,560 - $2,045
26,671
kWh
$8,241
132
kW-months/year
$1,922
114
gal
$1,560
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ $
Electricity Usage Electricity Demand Other Liquid (haz) Administrative Changes Electricity Usage Electricity Demand Other Liquid (haz) Administrative Changes