IAC logo
IAC Assessment: SD0222
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0222
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1999
Principal Product Food products
NAICS n/a
SIC 2099 - Food Preparations, Nec
Sales $50,000,000-$100,000,000
# of Employees 150
Plant Area (Sq.Ft.) 120,000
Annual Production 58,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $200,995 3,632,767 kWh $0.06
Electricity Demand $101,626 7,641 kW-months/year $13.30
Natural Gas $55,384 13,696 MMBtu $4.04
TOTAL ENERGY COSTS $374,546
RECOMMENDED SAVINGS* $56,183 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,813
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,813
Cost:
$4,697
$994 17,878 $819 62 - - - - $994
17,878
kWh
$819
62
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$1,888
Cost:
$2,790
$1,035 18,757 $853 64 - - - - $1,035
18,757
kWh
$853
64
kW-months/year
-
-
MMBtu
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,584
Cost:
$6,000
- - - - $2,584 631 - - -
-
kWh
-
-
kW-months/year
$2,584
631
MMBtu
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,823
Cost:
$19,600
$3,787 68,288 $3,036 228 - - - - $3,787
68,288
kWh
$3,036
228
kW-months/year
-
-
MMBtu
-
-
$
05: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION Savings:
$7,799
Cost:
$11,000
$5,764 108,148 $2,035 216 - - - - $5,764
108,148
kWh
$2,035
216
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$24,876
Cost:
$14,300
$13,465 242,673 $11,411 858 - - - - $13,465
242,673
kWh
$11,411
858
kW-months/year
-
-
MMBtu
-
-
$
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$10,400
Cost:
$10,000
- - - - - - $10,400 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$10,400
-
$
TOTAL RECOMMENDED Savings:
$56,183
Cost:
$68,387
$25,045 455,744 $18,154 1,428 $2,584 631 $10,400 - $25,045
455,744
kWh
$18,154
1,428
kW-months/year
$2,584
631
MMBtu
$10,400
-
$
TOTAL IMPLEMENTED Savings:
$1,813
Cost:
$4,697
$994 17,878 $819 62 - - - - $994
17,878
kWh
$819
62
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes