IAC Assessment: SD0228
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0228
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 1999
Principal Product Transducers
NAICS n/a
SIC 3829 - Measuring & Controlling Devices, Nec
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 68,500
Annual Production 25,000 Pieces
Production Hrs. Annual 4,862
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $213,211 3,053,927 kWh $0.07
Electricity Demand $43,601 7,781 kW-months/year $5.60
Natural Gas $943 138 MMBtu $6.83
TOTAL ENERGY COSTS $260,980
RECOMMENDED SAVINGS* $97,985 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,203
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Gaseous Waste Administrative Changes Electricity Usage Electricity Demand Gaseous Waste Administrative Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,410
Cost:
$6,484
$12,190 174,678 $2,220 397 - - - - $12,190
174,678
kWh
$2,220
397
kW-months/year
-
-
lb
-
-
$
02: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM Savings:
$5,156
Cost:
$4,875
$3,579 51,290 $1,577 282 - - - - $3,579
51,290
kWh
$1,577
282
kW-months/year
-
-
lb
-
-
$
03: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$8,513
Cost:
$16,000
- - - - $8,513 106,944 - - -
-
kWh
-
-
kW-months/year
$8,513
106,944
lb
-
-
$
04: 4.4460 AUTOMATE FINISHING PROCESS Savings:
$69,113
Cost:
$11,500
- - - - - - $69,113 - -
-
kWh
-
-
kW-months/year
-
-
lb
$69,113
-
$
05: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$793
Cost:
-
- - - - - - $793 - -
-
kWh
-
-
kW-months/year
-
-
lb
$793
-
$
TOTAL RECOMMENDED Savings:
$97,985
Cost:
$38,859
$15,769 225,968 $3,797 679 $8,513 106,944 $69,906 - $15,769
225,968
kWh
$3,797
679
kW-months/year
$8,513
106,944
lb
$69,906
-
$
TOTAL IMPLEMENTED Savings:
$15,203
Cost:
$6,484
$12,190 174,678 $2,220 397 - - $793 - $12,190
174,678
kWh
$2,220
397
kW-months/year
-
-
lb
$793
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Gaseous Waste Administrative Changes Electricity Usage Electricity Demand Gaseous Waste Administrative Changes