IAC Assessment: SD0243
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0243
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2000
Principal Product metal plating
NAICS n/a
SIC 3471 - Plating And Polishing
Sales $5,000,000-$10,000,000
# of Employees 100
Plant Area (Sq.Ft.) 30,000
Annual Production 70,000 Pieces
Production Hrs. Annual 6,375
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $121,045 1,975,967 kWh $0.06
Electricity Demand $91,161 15,206 kW-months/year $6.00
Electricity Fees $3,838 - $ -
Natural Gas $57,157 12,942 MMBtu $4.42
TOTAL ENERGY COSTS $372,534
RECOMMENDED SAVINGS* $86,268 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,600
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Administrative Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Administrative Changes Water Consumption
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ Tgal
01: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$17,132
Cost:
$28,575
$10,372 169,109 $6,760 376 - - - - - - - - $10,372
169,109
kWh
$6,760
376
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
Tgal
02: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$8,431
Cost:
$7,000
$6,236 101,700 $2,195 122 - - - - - - - - $6,236
101,700
kWh
$2,195
122
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
Tgal
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,270
Cost:
$3,300
$6,270 102,286 - - - - - - - - - - $6,270
102,286
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
Tgal
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,673
Cost:
$11,336
$3,810 62,134 $1,863 104 - - - - - - - - $3,810
62,134
kWh
$1,863
104
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
Tgal
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$5,209
Cost:
$7,872
$2,634 43,083 $2,575 143 - - - - - - - - $2,634
43,083
kWh
$2,575
143
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
Tgal
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,293
Cost:
$9,936
- - - - $4,293 982 - - - - - - -
-
kWh
-
-
kW-months/year
$4,293
982
MMBtu
-
-
lb
-
-
$
-
-
Tgal
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,087
Cost:
-
$2,370 38,687 $1,717 96 - - - - - - - - $2,370
38,687
kWh
$1,717
96
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
Tgal
08: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,753
Cost:
$1,300
$1,839 30,188 $1,553 86 $(-639) (-146) - - - - - - $1,839
30,188
kWh
$1,553
86
kW-months/year
$(-639)
(-146)
MMBtu
-
-
lb
-
-
$
-
-
Tgal
09: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,098
Cost:
$500
- - - - $1,098 251 - - - - - - -
-
kWh
-
-
kW-months/year
$1,098
251
MMBtu
-
-
lb
-
-
$
-
-
Tgal
10: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$953
Cost:
$2,425
- - - - $953 218 - - - - - - -
-
kWh
-
-
kW-months/year
$953
218
MMBtu
-
-
lb
-
-
$
-
-
Tgal
11: 2.9113 USE SOLAR HEAT FOR HEAT Savings:
$536
Cost:
$1,200
- - - - $536 1,227 - - - - - - -
-
kWh
-
-
kW-months/year
$536
1,227
MMBtu
-
-
lb
-
-
$
-
-
Tgal
12: 3.5242 RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE Savings:
$9,975
Cost:
$50,000
- - - - - - $9,975 4,500 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$9,975
4,500
lb
-
-
$
-
-
Tgal
13: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$17,848
Cost:
$35,000
- - - - - - - - - - $17,848 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$17,848
-
Tgal
14: 4.6510 INSTALL BACK-UP EQUIPMENT Savings:
$2,010
Cost:
$1,000
- - - - - - - - $2,010 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$2,010
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$86,268
Cost:
$159,444
$33,531 547,187 $16,663 927 $6,241 2,532 $9,975 4,500 $2,010 - $17,848 - $33,531
547,187
kWh
$16,663
927
kW-months/year
$6,241
2,532
MMBtu
$9,975
4,500
lb
$2,010
-
$
$17,848
-
Tgal
TOTAL IMPLEMENTED Savings:
$10,600
Cost:
$18,308
$2,634 43,083 $2,575 143 $5,391 1,233 - - - - - - $2,634
43,083
kWh
$2,575
143
kW-months/year
$5,391
1,233
MMBtu
-
-
lb
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Administrative Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Administrative Changes Water Consumption