Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2000 |
Principal Product | metal plating |
NAICS | n/a |
SIC | 3471 - Plating And Polishing |
Sales | $5,000,000-$10,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 30,000 |
Annual Production | 70,000 Pieces |
Production Hrs. Annual | 6,375 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $121,045 | 1,975,967 | kWh | $0.06 |
Electricity Demand | $91,161 | 15,206 | kW-months/year | $6.00 |
Electricity Fees | $3,838 | - | $ | - |
Natural Gas | $57,157 | 12,942 | MMBtu | $4.42 |
TOTAL ENERGY COSTS | $372,534 | |||
RECOMMENDED SAVINGS* | $86,268 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $10,600 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (haz) | Administrative Changes | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (haz) | Administrative Changes | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL |
Savings: $17,132 Cost: $28,575 |
$10,372 | 169,109 | $6,760 | 376 | - | - | - | - | - | - | - | - |
$10,372 169,109 kWh |
$6,760 376 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY |
Savings: $8,431 Cost: $7,000 |
$6,236 | 101,700 | $2,195 | 122 | - | - | - | - | - | - | - | - |
$6,236 101,700 kWh |
$2,195 122 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $6,270 Cost: $3,300 |
$6,270 | 102,286 | - | - | - | - | - | - | - | - | - | - |
$6,270 102,286 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,673 Cost: $11,336 |
$3,810 | 62,134 | $1,863 | 104 | - | - | - | - | - | - | - | - |
$3,810 62,134 kWh |
$1,863 104 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $5,209 Cost: $7,872 |
$2,634 | 43,083 | $2,575 | 143 | - | - | - | - | - | - | - | - |
$2,634 43,083 kWh |
$2,575 143 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $4,293 Cost: $9,936 |
- | - | - | - | $4,293 | 982 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,293 982 MMBtu |
- - lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $4,087 Cost: - |
$2,370 | 38,687 | $1,717 | 96 | - | - | - | - | - | - | - | - |
$2,370 38,687 kWh |
$1,717 96 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $2,753 Cost: $1,300 |
$1,839 | 30,188 | $1,553 | 86 | $(-639) | (-146) | - | - | - | - | - | - |
$1,839 30,188 kWh |
$1,553 86 kW-months/year |
$(-639) (-146) MMBtu |
- - lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $1,098 Cost: $500 |
- | - | - | - | $1,098 | 251 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,098 251 MMBtu |
- - lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $953 Cost: $2,425 |
- | - | - | - | $953 | 218 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$953 218 MMBtu |
- - lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.9113 USE SOLAR HEAT FOR HEAT |
Savings: $536 Cost: $1,200 |
- | - | - | - | $536 | 1,227 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$536 1,227 MMBtu |
- - lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.5242 RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE |
Savings: $9,975 Cost: $50,000 |
- | - | - | - | - | - | $9,975 | 4,500 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$9,975 4,500 lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION |
Savings: $17,848 Cost: $35,000 |
- | - | - | - | - | - | - | - | - | - | $17,848 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
$17,848 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 4.651 INSTALL BACK-UP EQUIPMENT |
Savings: $2,010 Cost: $1,000 |
- | - | - | - | - | - | - | - | $2,010 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$2,010 - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $86,268 Cost: $159,444 |
$33,531 | 547,187 | $16,663 | 927 | $6,241 | 2,532 | $9,975 | 4,500 | $2,010 | - | $17,848 | - | $33,531 547,187 kWh |
$16,663 927 kW-months/year |
$6,241 2,532 MMBtu |
$9,975 4,500 lb |
$2,010 - $ |
$17,848 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $10,600 Cost: $18,308 |
$2,634 | 43,083 | $2,575 | 143 | $5,391 | 1,233 | - | - | - | - | - | - | $2,634 43,083 kWh |
$2,575 143 kW-months/year |
$5,391 1,233 MMBtu |
- - lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (haz) | Administrative Changes | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (haz) | Administrative Changes | Water Consumption |