IAC Assessment: SD0267
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0267
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2001
Principal Product bread and rolls
NAICS n/a
SIC 2051 - Bread, Cake, And Related Products
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 80,000
Annual Production 15,600,000 Pieces
Production Hrs. Annual 6,240
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $185,518 2,785,839 kWh $0.07
Electricity Demand $73,976 6,097 kW-months/year $12.13
Electricity Fees $1,512 - $ -
Natural Gas $214,223 41,579 MMBtu $5.15
TOTAL ENERGY COSTS $491,606
RECOMMENDED SAVINGS* $289,233 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $74,880
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $
01: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$16,273
Cost:
$35,000
- - - - $9,557 1,939 $6,716 4,368,000 - - - - - - -
-
kWh
-
-
kW-months/year
$9,557
1,939
MMBtu
$6,716
4,368,000
Tgal
-
-
lb
-
-
$
-
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$7,749
Cost:
$18,000
- - - - $7,749 1,573 - - - - - - - - -
-
kWh
-
-
kW-months/year
$7,749
1,573
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
03: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$5,074
Cost:
$5,360
$4,282 64,297 $792 65 - - - - - - - - - - $4,282
64,297
kWh
$792
65
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$228
Cost:
$160
- - - - $228 46 - - - - - - - - -
-
kWh
-
-
kW-months/year
$228
46
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,428
Cost:
$8,700
$902 13,538 $526 43 - - - - - - - - - - $902
13,538
kWh
$526
43
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$6,291
Cost:
$7,900
- - - - - - - - $6,291 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$6,291
-
lb
-
-
$
-
-
$
07: 3.5131 RECYCLE WHITE WATER Savings:
$1,727
Cost:
$4,100
- - - - - - $1,727 1,123,200 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,727
1,123,200
Tgal
-
-
lb
-
-
$
-
-
$
08: 4.4460 AUTOMATE FINISHING PROCESS Savings:
$74,880
Cost:
$75,000
- - - - - - - - - - $74,880 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$74,880
-
$
-
-
$
09: 4.4460 AUTOMATE FINISHING PROCESS Savings:
$145,760
Cost:
$160,000
- - - - - - - - - - $145,760 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$145,760
-
$
-
-
$
10: 4.4450 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$28,952
Cost:
$20,000
- - - - - - - - - - $28,952 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$28,952
-
$
-
-
$
11: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$871
Cost:
-
- - - - - - - - - - - - $871 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
$871
-
$
TOTAL RECOMMENDED Savings:
$289,233
Cost:
$334,220
$5,184 77,835 $1,318 108 $17,534 3,558 $8,443 5,491,200 $6,291 - $249,592 - $871 - $5,184
77,835
kWh
$1,318
108
kW-months/year
$17,534
3,558
MMBtu
$8,443
5,491,200
Tgal
$6,291
-
lb
$249,592
-
$
$871
-
$
TOTAL IMPLEMENTED Savings:
$74,880
Cost:
$75,000
- - - - - - - - - - $74,880 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$74,880
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Personnel Changes One-time Revenue or Avoided Cost