Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2001 |
Principal Product | rubber o-rings |
NAICS | n/a |
SIC | 3053 - Gaskets, Packing And Sealing Devices |
Sales | $10,000,000-$50,000,000 |
# of Employees | 650 |
Plant Area (Sq.Ft.) | 200,000 |
Annual Production | 1,500,000 Pounds |
Production Hrs. Annual | 7,200 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $783,886 | 15,392,861 | kWh | $0.05 |
Electricity Demand | $326,400 | 32,021 | kW-months/year | $10.19 |
Electricity Fees | $4,308 | - | $ | - |
Natural Gas | $12,940 | 4,702 | MMBtu | $2.75 |
TOTAL ENERGY COSTS | $1,127,534 | |||
RECOMMENDED SAVINGS* | $1,546,786 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $412,259 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Water Consumption | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Water Consumption | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | $ | $ | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.5194 REDESIGN PROCESS |
Savings: $182,520 Cost: $35,000 |
$66,874 | 1,311,250 | $29,246 | 2,870 | - | - | - | - | - | - | $129,600 | - | $(-43,200) | - | - | - | - | - |
$66,874 1,311,250 kWh |
$29,246 2,870 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
$129,600 - $ |
$(-43,200) - $ |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING |
Savings: $21,642 Cost: $15,000 |
$18,564 | 364,007 | $6,078 | 685 | - | - | - | - | - | - | - | - | $(-3,000) | - | - | - | - | - |
$18,564 364,007 kWh |
$6,078 685 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
$(-3,000) - $ |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $23,189 Cost: $800 |
$21,898 | 429,376 | $7,291 | 716 | - | - | - | - | - | - | $(-6,000) | - | - | - | - | - | - | - |
$21,898 429,376 kWh |
$7,291 716 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
$(-6,000) - $ |
- - $ |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $63,100 Cost: $90,000 |
$47,489 | 933,120 | $26,412 | 2,592 | $(-10,801) | (-39,799) | - | - | - | - | - | - | - | - | - | - | - | - |
$47,489 933,120 kWh |
$26,412 2,592 kW-months/year |
$(-10,801) (-39,799) MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $27,077 Cost: $36,000 |
$20,311 | 398,260 | $6,766 | 664 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$20,311 398,260 kWh |
$6,766 664 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $51,823 Cost: $103,000 |
$38,871 | 762,174 | $12,952 | 1,271 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$38,871 762,174 kWh |
$12,952 1,271 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7145 INSTALL SKYLIGHTS |
Savings: $7,878 Cost: $12,500 |
$3,378 | 66,240 | $4,500 | 442 | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$3,378 66,240 kWh |
$4,500 442 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.3416 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST |
Savings: $983,363 Cost: $3,037,200 |
$788,746 | 15,465,600 | $262,657 | 25,776 | $(-738,838) | (-272,232) | - | - | - | - | - | - | - | - | - | - | $670,798 | - |
$788,746 15,465,600 kWh |
$262,657 25,776 kW-months/year |
$(-738,838) (-272,232) MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - Tgal |
$670,798 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $32,522 Cost: $5,000 |
- | - | - | - | - | - | - | - | $10,764 | 63,000 | $(-28,800) | - | $51,558 | - | $(-1,000) | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$10,764 63,000 lb |
$(-28,800) - $ |
$51,558 - $ |
$(-1,000) - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.4131 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT |
Savings: $3,170 Cost: $1,500 |
- | - | - | - | - | - | $3,170 | 3,162 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$3,170 3,162 gal |
- - lb |
- - $ |
- - $ |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES |
Savings: $648 Cost: - |
- | - | - | - | - | - | $648 | 792 | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$648 792 gal |
- - lb |
- - $ |
- - $ |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $25,910 Cost: $15,000 |
- | - | - | - | - | - | - | - | - | - | - | - | $(-500) | - | - | - | $26,410 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
$(-500) - $ |
- - Tgal |
$26,410 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 3.5218 REUSE / RECYCLE/ SELL RUBBER PRODUCTS |
Savings: $35,880 Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | $35,880 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - Tgal |
$35,880 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES |
Savings: $1,393 Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | $1,393 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - $ |
- - Tgal |
$1,393 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 4.424 IMPROVE SPACE COMFORT CONDITIONING |
Savings: $65,375 Cost: $30,000 |
- | - | - | - | - | - | - | - | - | - | - | - | $65,375 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
$65,375 - $ |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
16: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE |
Savings: $21,296 Cost: $30,000 |
- | - | - | - | - | - | - | - | - | - | $8,352 | - | $12,944 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
$8,352 - $ |
$12,944 - $ |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $1,546,786 Cost: $3,411,000 |
$1,006,131 | 19,730,027 | $355,902 | 35,016 | $(-749,639) | (-312,031) | $3,818 | 3,954 | $10,764 | 63,000 | $103,152 | - | $83,177 | - | $(-1,000) | - | $734,481 | - | $1,006,131 19,730,027 kWh |
$355,902 35,016 kW-months/year |
$(-749,639) (-312,031) MMBtu |
$3,818 3,954 gal |
$10,764 63,000 lb |
$103,152 - $ |
$83,177 - $ |
$(-1,000) - Tgal |
$734,481 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $412,259 Cost: $223,800 |
$169,896 | 3,331,307 | $66,833 | 6,648 | - | - | $3,818 | 3,954 | $10,764 | 63,000 | $94,800 | - | $4,858 | - | $(-1,000) | - | $62,290 | - | $169,896 3,331,307 kWh |
$66,833 6,648 kW-months/year |
- - MMBtu |
$3,818 3,954 gal |
$10,764 63,000 lb |
$94,800 - $ |
$4,858 - $ |
$(-1,000) - Tgal |
$62,290 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | $ | $ | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Water Consumption | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Water Consumption | One-time Revenue or Avoided Cost |