IAC Assessment: SD0270
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0270
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2001
Principal Product rubber o-rings
NAICS n/a
SIC 3053 - Gaskets, Packing And Sealing Devices
Sales $10,000,000-$50,000,000
# of Employees 650
Plant Area (Sq.Ft.) 200,000
Annual Production 1,500,000 Pounds
Production Hrs. Annual 7,200
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $783,886 15,392,861 kWh $0.05
Electricity Demand $326,400 32,021 kW-months/year $10.19
Electricity Fees $4,308 - $ -
Natural Gas $12,940 4,702 MMBtu $2.75
TOTAL ENERGY COSTS $1,127,534
RECOMMENDED SAVINGS* $1,546,786 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $412,259
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Water Consumption One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Water Consumption One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $ $ Tgal $ $
01: 2.5194 REDESIGN PROCESS Savings:
$182,520
Cost:
$35,000
$66,874 1,311,250 $29,246 2,870 - - - - - - $129,600 - $(-43,200) - - - - - $66,874
1,311,250
kWh
$29,246
2,870
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$129,600
-
$
$(-43,200)
-
$
-
-
Tgal
-
-
$
02: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$21,642
Cost:
$15,000
$18,564 364,007 $6,078 685 - - - - - - - - $(-3,000) - - - - - $18,564
364,007
kWh
$6,078
685
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
$(-3,000)
-
$
-
-
Tgal
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$23,189
Cost:
$800
$21,898 429,376 $7,291 716 - - - - - - $(-6,000) - - - - - - - $21,898
429,376
kWh
$7,291
716
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$(-6,000)
-
$
-
-
$
-
-
Tgal
-
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$63,100
Cost:
$90,000
$47,489 933,120 $26,412 2,592 $(-10,801) (-39,799) - - - - - - - - - - - - $47,489
933,120
kWh
$26,412
2,592
kW-months/year
$(-10,801)
(-39,799)
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$27,077
Cost:
$36,000
$20,311 398,260 $6,766 664 - - - - - - - - - - - - - - $20,311
398,260
kWh
$6,766
664
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$51,823
Cost:
$103,000
$38,871 762,174 $12,952 1,271 - - - - - - - - - - - - - - $38,871
762,174
kWh
$12,952
1,271
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
-
-
$
07: 2.7145 INSTALL SKYLIGHTS Savings:
$7,878
Cost:
$12,500
$3,378 66,240 $4,500 442 - - - - - - - - - - - - - - $3,378
66,240
kWh
$4,500
442
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
-
-
$
08: 2.3416 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST Savings:
$983,363
Cost:
$3,037,200
$788,746 15,465,600 $262,657 25,776 $(-738,838) (-272,232) - - - - - - - - - - $670,798 - $788,746
15,465,600
kWh
$262,657
25,776
kW-months/year
$(-738,838)
(-272,232)
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
$670,798
-
$
09: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$32,522
Cost:
$5,000
- - - - - - - - $10,764 63,000 $(-28,800) - $51,558 - $(-1,000) - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$10,764
63,000
lb
$(-28,800)
-
$
$51,558
-
$
$(-1,000)
-
Tgal
-
-
$
10: 3.4131 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT Savings:
$3,170
Cost:
$1,500
- - - - - - $3,170 3,162 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,170
3,162
gal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
-
-
$
11: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$648
Cost:
-
- - - - - - $648 792 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$648
792
gal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
-
-
$
12: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$25,910
Cost:
$15,000
- - - - - - - - - - - - $(-500) - - - $26,410 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
$(-500)
-
$
-
-
Tgal
$26,410
-
$
13: 3.5218 REUSE / RECYCLE/ SELL RUBBER PRODUCTS Savings:
$35,880
Cost:
-
- - - - - - - - - - - - - - - - $35,880 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
$35,880
-
$
14: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$1,393
Cost:
-
- - - - - - - - - - - - - - - - $1,393 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
$1,393
-
$
15: 4.424 IMPROVE SPACE COMFORT CONDITIONING Savings:
$65,375
Cost:
$30,000
- - - - - - - - - - - - $65,375 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
$65,375
-
$
-
-
Tgal
-
-
$
16: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$21,296
Cost:
$30,000
- - - - - - - - - - $8,352 - $12,944 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$8,352
-
$
$12,944
-
$
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$1,546,786
Cost:
$3,411,000
$1,006,131 19,730,027 $355,902 35,016 $(-749,639) (-312,031) $3,818 3,954 $10,764 63,000 $103,152 - $83,177 - $(-1,000) - $734,481 - $1,006,131
19,730,027
kWh
$355,902
35,016
kW-months/year
$(-749,639)
(-312,031)
MMBtu
$3,818
3,954
gal
$10,764
63,000
lb
$103,152
-
$
$83,177
-
$
$(-1,000)
-
Tgal
$734,481
-
$
TOTAL IMPLEMENTED Savings:
$412,259
Cost:
$223,800
$169,896 3,331,307 $66,833 6,648 - - $3,818 3,954 $10,764 63,000 $94,800 - $4,858 - $(-1,000) - $62,290 - $169,896
3,331,307
kWh
$66,833
6,648
kW-months/year
-
-
MMBtu
$3,818
3,954
gal
$10,764
63,000
lb
$94,800
-
$
$4,858
-
$
$(-1,000)
-
Tgal
$62,290
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $ $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Water Consumption One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Water Consumption One-time Revenue or Avoided Cost