IAC logo
IAC Assessment: SD0285
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0285
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2002
Principal Product Education and Commercial Furniture
NAICS n/a
SIC 2531 - Public Building & Related Furniture
Sales $100,000,000-$500,000,000
# of Employees 500
Plant Area (Sq.Ft.) 560,000
Annual Production 250,000 Pieces
Production Hrs. Annual 4,862
Location (State) CA
View Case Study
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $676,882 8,672,495 kWh $0.08
Electricity Demand $357,945 27,066 kW-months/year $13.22
Electricity Fees $7,176 - $ -
Natural Gas $228,994 31,730 MMBtu $7.22
TOTAL ENERGY COSTS $1,291,614
RECOMMENDED SAVINGS* $748,434 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $158,117
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ $
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$27,865
Cost:
$25,000
$22,484 184,446 $5,381 407 - - - - - - - - $22,484
184,446
kWh
$5,381
407
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$3,921
Cost:
-
$3,163 25,944 $758 57 - - - - - - - - $3,163
25,944
kWh
$758
57
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.7145 INSTALL SKYLIGHTS Savings:
$58,765
Cost:
$32,000
$34,665 284,376 $24,100 1,823 - - - - - - - - $34,665
284,376
kWh
$24,100
1,823
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$25,082
Cost:
$1,720
$20,236 166,001 $4,846 367 - - - - - - - - $20,236
166,001
kWh
$4,846
367
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,764
Cost:
$1,200
$1,764 14,470 - - - - - - - - - - $1,764
14,470
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$26,143
Cost:
$7,500
$20,749 170,214 $5,394 408 - - - - - - - - $20,749
170,214
kWh
$5,394
408
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$20,269
Cost:
-
$9,746 79,949 $10,523 796 - - - - - - - - $9,746
79,949
kWh
$10,523
796
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
08: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$6,906
Cost:
-
- - $4,266 324 - - - - $2,640 - - - -
-
kWh
$4,266
324
kW-months/year
-
-
lb
-
-
$
$2,640
-
$
-
-
$
09: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$9,714
Cost:
$1,600
$9,714 79,695 - - - - - - - - - - $9,714
79,695
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
10: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,641
Cost:
-
$682 5,595 $2,959 224 - - - - - - - - $682
5,595
kWh
$2,959
224
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$67,413
Cost:
$30,000
$53,506 438,935 $13,907 1,052 - - - - - - - - $53,506
438,935
kWh
$13,907
1,052
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
12: 3.5216 RECYCLE NONFERROUS DUST Savings:
$22,140
Cost:
$2,000
- - - - $22,140 - - - - - - - -
-
kWh
-
-
kW-months/year
$22,140
-
lb
-
-
$
-
-
$
-
-
$
13: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$64,680
Cost:
-
- - - - $64,680 - - - - - - - -
-
kWh
-
-
kW-months/year
$64,680
-
lb
-
-
$
-
-
$
-
-
$
14: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$32,964
Cost:
$20,000
- - - - - - - - - - $32,964 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
$32,964
-
$
15: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$160,160
Cost:
$2,000
- - - - - - $160,160 - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$160,160
-
$
-
-
$
-
-
$
16: 4.446 AUTOMATE FINISHING PROCESS Savings:
$80,080
Cost:
$85,000
- - - - - - $80,080 - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$80,080
-
$
-
-
$
-
-
$
17: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$11,880
Cost:
$34,800
- - - - - - - - - - $11,880 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
$11,880
-
$
18: 4.446 AUTOMATE FINISHING PROCESS Savings:
$80,080
Cost:
$85,000
- - - - - - $80,080 - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$80,080
-
$
-
-
$
-
-
$
19: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$4,927
Cost:
$3,500
- - - - $351 - $4,576 - - - - - -
-
kWh
-
-
kW-months/year
$351
-
lb
$4,576
-
$
-
-
$
-
-
$
20: 4.446 AUTOMATE FINISHING PROCESS Savings:
$40,040
Cost:
$15,000
- - - - - - $40,040 - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$40,040
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$748,434
Cost:
$346,320
$176,709 1,449,625 $72,134 5,458 $87,171 - $364,936 - $2,640 - $44,844 - $176,709
1,449,625
kWh
$72,134
5,458
kW-months/year
$87,171
-
lb
$364,936
-
$
$2,640
-
$
$44,844
-
$
TOTAL IMPLEMENTED Savings:
$158,117
Cost:
$6,520
$45,305 371,654 $23,352 1,768 $86,820 - - - $2,640 - - - $45,305
371,654
kWh
$23,352
1,768
kW-months/year
$86,820
-
lb
-
-
$
$2,640
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes One-time Revenue or Avoided Cost