Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2003 |
Principal Product | Stone coated steel roofing |
NAICS | 324122 - Asphalt Shingle and Coating Materials Manufacturing |
SIC | 3444 - Sheet Metalwork |
Sales | $10,000,000-$50,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 60,000 |
Annual Production | 3,200,000 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $169,903 | 1,409,296 | kWh | $0.12 |
Electricity Demand | $36,691 | 4,433 | kW-months/year | $8.28 |
TOTAL ENERGY COSTS | $216,194 | |||
RECOMMENDED SAVINGS* | $74,863 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $59,848 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Primary Raw Material | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $13,532 Cost: - |
$11,861 | 98,188 | $1,671 | 198 | - | - | - | - |
$11,861 98,188 kWh |
$1,671 198 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $5,385 Cost: $240 |
$4,725 | 39,120 | $660 | 78 | - | - | - | - |
$4,725 39,120 kWh |
$660 78 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY |
Savings: $4,863 Cost: $1,670 |
$4,124 | 34,146 | $739 | 88 | - | - | - | - |
$4,124 34,146 kWh |
$739 88 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $3,957 Cost: $1,185 |
$3,957 | 32,760 | - | - | - | - | - | - |
$3,957 32,760 kWh |
- - kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,692 Cost: $2,961 |
$2,101 | 17,388 | $591 | 70 | - | - | - | - |
$2,101 17,388 kWh |
$591 70 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $1,621 Cost: $500 |
$1,621 | 13,420 | - | - | - | - | - | - |
$1,621 13,420 kWh |
- - kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,327 Cost: $1,412 |
$1,167 | 9,660 | $160 | 19 | - | - | - | - |
$1,167 9,660 kWh |
$160 19 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $1,032 Cost: $2,000 |
$652 | 5,400 | $380 | 45 | - | - | - | - |
$652 5,400 kWh |
$380 45 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $31,334 Cost: $6,000 |
- | - | - | - | - | - | $31,334 | - |
- - kWh |
- - kW-months/year |
- - lb |
$31,334 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $9,120 Cost: - |
- | - | - | - | $9,120 | 2,166 | - | - |
- - kWh |
- - kW-months/year |
$9,120 2,166 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $74,863 Cost: $15,968 |
$30,208 | 250,082 | $4,201 | 498 | $9,120 | 2,166 | $31,334 | - | $30,208 250,082 kWh |
$4,201 498 kW-months/year |
$9,120 2,166 lb |
$31,334 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $59,848 Cost: $12,298 |
$25,432 | 210,536 | $3,082 | 365 | - | - | $31,334 | - | $25,432 210,536 kWh |
$3,082 365 kW-months/year |
- - lb |
$31,334 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Primary Raw Material | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Primary Raw Material |