IAC Assessment: SD0322
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0322
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2003
Principal Product PVC Sheet Manufacturing
NAICS 332312 - Fabricated Structural Metal Manufacturing
SIC 3441 - Fabricated Structural Metal
Sales $5,000,000-$10,000,000
# of Employees 45
Plant Area (Sq.Ft.) 217,800
Annual Production 5,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $321,124 2,834,955 kWh $0.11
Electricity Demand $97,538 7,238 kW-months/year $13.48
Natural Gas $18,220 3,473 MMBtu $5.25
TOTAL ENERGY COSTS $442,510
RECOMMENDED SAVINGS* $294,861 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,273
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$24,193
Cost:
-
- - $10,033 112 $14,160 - - - - - - - - - -
-
kWh
$10,033
112
kW-months/year
$14,160
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$12,151
Cost:
$6,000
$10,091 88,906 $2,060 151 - - - - - - - - - - $10,091
88,906
kWh
$2,060
151
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.7145 INSTALL SKYLIGHTS Savings:
$4,917
Cost:
$6,000
$3,908 34,434 $3,131 230 - - $(-2,122) (-405) - - - - - - $3,908
34,434
kWh
$3,131
230
kW-months/year
-
-
$
$(-2,122)
(-405)
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$5,952
Cost:
-
$5,952 52,441 - - - - - - - - - - - - $5,952
52,441
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,614
Cost:
$2,250
$3,273 28,835 $341 25 - - - - - - - - - - $3,273
28,835
kWh
$341
25
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$579
Cost:
$350
$579 5,102 - - - - - - - - - - - - $579
5,102
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,321
Cost:
$240
$1,928 16,984 $393 29 - - - - - - - - - - $1,928
16,984
kWh
$393
29
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
08: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$2,814
Cost:
$5,000
- - - - - - - - $2,814 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$2,814
-
lb
-
-
$
-
-
$
09: 4.521 CLEAR AND RENT EXISTING SPACE Savings:
$238,320
Cost:
$11,000
- - - - - - - - - - $220,320 - $18,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
$220,320
-
$
$18,000
-
$
TOTAL RECOMMENDED Savings:
$294,861
Cost:
$30,840
$25,731 226,702 $15,958 547 $14,160 - $(-2,122) (-405) $2,814 - $220,320 - $18,000 - $25,731
226,702
kWh
$15,958
547
kW-months/year
$14,160
-
$
$(-2,122)
(-405)
MMBtu
$2,814
-
lb
$220,320
-
$
$18,000
-
$
TOTAL IMPLEMENTED Savings:
$8,273
Cost:
$240
$7,880 69,425 $393 29 - - - - - - - - - - $7,880
69,425
kWh
$393
29
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes One-time Revenue or Avoided Cost