IAC logo
IAC Assessment: SD0323
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0323
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2003
Principal Product cable ties
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 19
Plant Area (Sq.Ft.) 25,000
Annual Production 894,000,000 Pieces
Production Hrs. Annual 6,600
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $364,652 3,719,833 kWh $0.10
Electricity Demand $122,685 9,473 kW-months/year $12.95
Natural Gas $4,600 616 MMBtu $7.47
TOTAL ENERGY COSTS $504,813
RECOMMENDED SAVINGS* $159,147 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $43,478
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Primary Raw Material
$ kWh $ kW-months/year $ $ $ lb $ $
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$37,042
Cost:
$41,000
$29,868 304,771 $7,174 554 - - - - - - $29,868
304,771
kWh
$7,174
554
kW-months/year
-
-
$
-
-
lb
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$30,015
Cost:
-
$24,304 247,998 $5,711 441 - - - - - - $24,304
247,998
kWh
$5,711
441
kW-months/year
-
-
$
-
-
lb
-
-
$
03: 2.7145 INSTALL SKYLIGHTS Savings:
$14,068
Cost:
$6,000
$7,479 76,320 $6,589 509 - - - - - - $7,479
76,320
kWh
$6,589
509
kW-months/year
-
-
$
-
-
lb
-
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$11,373
Cost:
$19,250
$11,373 100,200 - - - - - - - - $11,373
100,200
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$10,024
Cost:
$2,500
$5,284 53,913 $4,740 366 - - - - - - $5,284
53,913
kWh
$4,740
366
kW-months/year
-
-
$
-
-
lb
-
-
$
06: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$6,436
Cost:
$1,116
$6,436 65,670 - - - - - - - - $6,436
65,670
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
07: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,039
Cost:
-
- - $893 132 $146 - - - - - -
-
kWh
$893
132
kW-months/year
$146
-
$
-
-
lb
-
-
$
08: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$5,150
Cost:
$5,000
- - - - - - $5,150 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$5,150
-
lb
-
-
$
09: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$44,000
Cost:
$25,000
- - - - - - - - $44,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
$44,000
-
$
TOTAL RECOMMENDED Savings:
$159,147
Cost:
$99,866
$84,744 848,872 $25,107 2,002 $146 - $5,150 - $44,000 - $84,744
848,872
kWh
$25,107
2,002
kW-months/year
$146
-
$
$5,150
-
lb
$44,000
-
$
TOTAL IMPLEMENTED Savings:
$43,478
Cost:
$42,116
$36,304 370,441 $7,174 554 - - - - - - $36,304
370,441
kWh
$7,174
554
kW-months/year
-
-
$
-
-