IAC logo
IAC Assessment: SD0325
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0325
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2003
Principal Product Medical Products
NAICS 339112 - Surgical and Medical Instrument Manufacturing
SIC 3841 - Surgical And Medical Instruments
Sales n/a
# of Employees 450
Plant Area (Sq.Ft.) 50,000
Annual Production 92,800 Pieces
Production Hrs. Annual 6,000
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Demand $1,410,834 13,526,680 kW-months/year $0.10
TOTAL ENERGY COSTS $1,410,834
RECOMMENDED SAVINGS* $319,789 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $199,630
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$88,041
Cost:
$300,075
$83,053 796,289 $4,988 401 $83,053
796,289
kWh
$4,988
401
kW-months/year
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$71,754
Cost:
-
$67,376 645,987 $4,378 352 $67,376
645,987
kWh
$4,378
352
kW-months/year
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$53,956
Cost:
$32,725
$48,199 462,116 $5,757 462 $48,199
462,116
kWh
$5,757
462
kW-months/year
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$37,849
Cost:
$2,000
$35,836 343,540 $2,013 162 $35,836
343,540
kWh
$2,013
162
kW-months/year
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$36,071
Cost:
$1,000
$36,071 345,840 - - $36,071
345,840
kWh
-
-
kW-months/year
06: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE Savings:
$14,542
Cost:
-
$4,988 47,826 $9,554 768 $4,988
47,826
kWh
$9,554
768
kW-months/year
07: 2.7145 INSTALL SKYLIGHTS Savings:
$9,297
Cost:
$18,000
$4,756 45,600 $4,541 365 $4,756
45,600
kWh
$4,541
365
kW-months/year
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$8,279
Cost:
$1,410
$8,279 79,381 - - $8,279
79,381
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$319,789
Cost:
$355,210
$288,558 2,766,579 $31,231 2,510 $288,558
2,766,579
kWh
$31,231
2,510
kW-months/year
TOTAL IMPLEMENTED Savings:
$199,630
Cost:
$35,725
$187,482 1,797,483 $12,148 976 $187,482
1,797,483
kWh
$12,148
976
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand