IAC Assessment: SD0339
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2004
Principal Product Medical instraments
NAICS 339112 - Surgical and Medical Instrument Manufacturing
SIC 3841 - Surgical And Medical Instruments
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 43,000
Annual Production 20,000 Pieces
Production Hrs. Annual 7,350
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $353,654 3,907,899 kWh $0.09
Electricity Demand $131,093 8,892 kW-months/year $14.74
TOTAL ENERGY COSTS $484,747
RECOMMENDED SAVINGS* $38,032 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,943
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)
$ kWh $ kW-months/year $ lb
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$15,112
Cost:
$320
$15,112 166,999 - - - - $15,112
166,999
kWh
-
-
kW-months/year
-
-
lb
02: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$8,250
Cost:
$2,570
$6,776 58,581 $1,474 100 - - $6,776
58,581
kWh
$1,474
100
kW-months/year
-
-
lb
03: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$3,831
Cost:
-
$3,831 42,336 - - - - $3,831
42,336
kWh
-
-
kW-months/year
-
-
lb
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$477
Cost:
$1,700
$477 5,274 - - - - $477
5,274
kWh
-
-
kW-months/year
-
-
lb
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$10,362
Cost:
$10,000
- - - - $10,362 - -
-
kWh
-
-
kW-months/year
$10,362
-
lb
TOTAL RECOMMENDED Savings:
$38,032
Cost:
$14,590
$26,196 273,190 $1,474 100 $10,362 - $26,196
273,190
kWh
$1,474
100
kW-months/year
$10,362
-
lb
TOTAL IMPLEMENTED Savings:
$18,943
Cost:
$320
$18,943 209,335 - - - - $18,943
209,335
kWh
-
-
kW-months/year
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ lb
Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)