Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2004 |
Principal Product | Springs |
NAICS | 332613 - Spring Manufacturing |
SIC | 3493 - Steel Springs, Except Wire |
Sales | $10,000,000-$50,000,000 |
# of Employees | 65 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 637,500 Pieces |
Production Hrs. Annual | 4,080 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $134,601 | 1,149,039 | kWh | $0.12 |
Electricity Demand | $48,819 | 6,066 | kW-months/year | $8.05 |
Natural Gas | $15,218 | 2,069 | MMBtu | $7.36 |
TOTAL ENERGY COSTS | $198,638 | |||
RECOMMENDED SAVINGS* | $64,931 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $49,484 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $42,981 Cost: $35,875 |
$42,981 | 367,049 | - | - | - | - | - | - |
$42,981 367,049 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION |
Savings: $6,983 Cost: $7,700 |
- | - | - | - | $6,983 | 950 | - | - |
- - kWh |
- - kW-months/year |
$6,983 950 MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS |
Savings: $8,464 Cost: $27,829 |
$6,395 | 54,615 | $2,069 | 257 | - | - | - | - |
$6,395 54,615 kWh |
$2,069 257 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,104 Cost: $440 |
$74 | 632 | $1,030 | 128 | - | - | - | - |
$74 632 kWh |
$1,030 128 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $5,399 Cost: $18,500 |
- | - | - | - | - | - | $5,399 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$5,399 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $64,931 Cost: $90,344 |
$49,450 | 422,296 | $3,099 | 385 | $6,983 | 950 | $5,399 | - | $49,450 422,296 kWh |
$3,099 385 kW-months/year |
$6,983 950 MMBtu |
$5,399 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $49,484 Cost: $54,815 |
$43,055 | 367,681 | $1,030 | 128 | - | - | $5,399 | - | $43,055 367,681 kWh |
$1,030 128 kW-months/year |
- - MMBtu |
$5,399 - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) |