Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2005 |
Principal Product | corrugated fiberboard |
NAICS | 326191 - Plastics Plumbing Fixture Manufacturing |
SIC | 3088 - Plastics Plumbing Fixtures |
Sales | $10,000,000-$50,000,000 |
# of Employees | 130 |
Plant Area (Sq.Ft.) | 125,000 |
Annual Production | 900,000,000 Pieces |
Production Hrs. Annual | 6,600 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $608,321 | 14,322,685 | kWh | $0.04 |
Electricity Demand | $82,373 | 10,187 | kW-months/year | $8.09 |
Natural Gas | $286,137 | 50,374 | MMBtu | $5.68 |
TOTAL ENERGY COSTS | $978,902 | |||
RECOMMENDED SAVINGS* | $82,445 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $56,892 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES |
Savings: $10,212 Cost: $3,850 |
- | - | - | - | $10,212 | 1,799 | - | - | - | - |
- - kWh |
- - kW-months/year |
$10,212 1,799 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $5,194 Cost: $360 |
$4,631 | 38,355 | $563 | 70 | - | - | - | - | - | - |
$4,631 38,355 kWh |
$563 70 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $980 Cost: $76 |
$980 | 23,060 | - | - | - | - | - | - | - | - |
$980 23,060 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2126 LOWER OPERATING PRESSURE OF CONDENSER (STEAM) |
Savings: $593 Cost: - |
- | - | - | - | $593 | 77 | - | - | - | - |
- - kWh |
- - kW-months/year |
$593 77 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $550 Cost: $1,050 |
- | - | - | - | $550 | 97 | - | - | - | - |
- - kWh |
- - kW-months/year |
$550 97 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $14,023 Cost: $37,287 |
$9,921 | 278,678 | $4,102 | 507 | - | - | - | - | - | - |
$9,921 278,678 kWh |
$4,102 507 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $13,768 Cost: $18,500 |
- | - | - | - | - | - | $13,768 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$13,768 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE |
Savings: $37,125 Cost: $52,500 |
- | - | - | - | - | - | - | - | $37,125 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$37,125 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $82,445 Cost: $113,623 |
$15,532 | 340,093 | $4,665 | 577 | $11,355 | 1,973 | $13,768 | - | $37,125 | - | $15,532 340,093 kWh |
$4,665 577 kW-months/year |
$11,355 1,973 MMBtu |
$13,768 - lb |
$37,125 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $56,892 Cost: $91,197 |
$14,552 | 317,033 | $4,665 | 577 | $550 | 97 | - | - | $37,125 | - | $14,552 317,033 kWh |
$4,665 577 kW-months/year |
$550 97 MMBtu |
- - lb |
$37,125 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Primary Raw Material |