IAC Assessment: SD0363
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0363
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2005
Principal Product Wire and Construction Nails
NAICS 332613 - Spring Manufacturing
SIC 3315 - Steel Wire And Related Products
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 80,000
Annual Production 25,000 Tons
Production Hrs. Annual 6,600
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $525,734 8,739,812 kWh $0.06
Electricity Demand $108,165 23,078 kW-months/year $4.69
Natural Gas $177,383 28,991 MMBtu $6.12
TOTAL ENERGY COSTS $811,282
RECOMMENDED SAVINGS* $294,860 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,090
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$9,477
Cost:
$17,705
- - - - $9,477 1,549 - - - - -
-
kWh
-
-
kW-months/year
$9,477
1,549
MMBtu
-
-
lb
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,125
Cost:
$9,250
$4,487 74,540 $638 136 - - - - - - $4,487
74,540
kWh
$638
136
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,335
Cost:
$12,575
$5,335 88,625 - - - - - - - - $5,335
88,625
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,442
Cost:
$8,400
- - - - $4,442 726 - - - - -
-
kWh
-
-
kW-months/year
$4,442
726
MMBtu
-
-
lb
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,107
Cost:
$4,600
$2,107 34,997 - - - - - - - - $2,107
34,997
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,580
Cost:
$640
$1,385 22,995 $195 42 - - - - - - $1,385
22,995
kWh
$195
42
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
07: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$1,445
Cost:
$230
$1,445 23,991 - - - - - - - - $1,445
23,991
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$26,090
Cost:
$31,655
$23,210 337,709 $2,880 614 - - - - - - $23,210
337,709
kWh
$2,880
614
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
09: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$229,203
Cost:
$92,000
$(-898) (-14,920) $(-2,099) (-448) - - $258,600 300,000 $(-26,400) - $(-898)
(-14,920)
kWh
$(-2,099)
(-448)
kW-months/year
-
-
MMBtu
$258,600
300,000
lb
$(-26,400)
-
$
10: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$10,056
Cost:
$18,500
- - - - - - $10,056 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$10,056
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$294,860
Cost:
$195,555
$37,071 567,937 $1,614 344 $13,919 2,275 $268,656 300,000 $(-26,400) - $37,071
567,937
kWh
$1,614
344
kW-months/year
$13,919
2,275
MMBtu
$268,656
300,000
lb
$(-26,400)
-
$
TOTAL IMPLEMENTED Savings:
$26,090
Cost:
$31,655
$23,210 337,709 $2,880 614 - - - - - - $23,210
337,709
kWh
$2,880
614
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) One-time Revenue or Avoided Cost