IAC Assessment: SD0371
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0371
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2005
Principal Product Plastic Containers
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 75
Plant Area (Sq.Ft.) 30,000
Annual Production 5,500,000 Pounds
Production Hrs. Annual 6,600
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $427,568 6,288,994 kWh $0.07
Electricity Demand $176,296 16,164 kW-months/year $10.91
Natural Gas $8,025 903 MMBtu $8.89
TOTAL ENERGY COSTS $611,889
RECOMMENDED SAVINGS* $134,868 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,710
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$31,113
Cost:
$52
$31,113 457,542 - - - - - - $31,113
457,542
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
02: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$17,251
Cost:
$3,850
$17,251 252,215 - - - - - - $17,251
252,215
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,329
Cost:
$6,950
$8,329 122,489 - - - - - - $8,329
122,489
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$7,944
Cost:
$12,000
$13,399 152,847 - - - - $(-5,455) (-614) $13,399
152,847
kWh
-
-
kW-months/year
-
-
$
$(-5,455)
(-614)
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,710
Cost:
$140
$4,423 65,041 $1,287 118 - - - - $4,423
65,041
kWh
$1,287
118
kW-months/year
-
-
$
-
-
MMBtu
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$4,914
Cost:
$648
$3,804 55,936 $1,110 102 - - - - $3,804
55,936
kWh
$1,110
102
kW-months/year
-
-
$
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$28,559
Cost:
$55,084
$22,111 325,169 $6,448 28,559 - - - - $22,111
325,169
kWh
$6,448
28,559
kW-months/year
-
-
$
-
-
MMBtu
08: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$31,048
Cost:
-
- - - - $31,048 - - - -
-
kWh
-
-
kW-months/year
$31,048
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$134,868
Cost:
$78,724
$100,430 1,431,239 $8,845 28,779 $31,048 - $(-5,455) (-614) $100,430
1,431,239
kWh
$8,845
28,779
kW-months/year
$31,048
-
$
$(-5,455)
(-614)
MMBtu
TOTAL IMPLEMENTED Savings:
$5,710
Cost:
$140
$4,423 65,041 $1,287 118 - - - - $4,423
65,041
kWh
$1,287
118
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas