Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2006 |
Principal Product | Pharmaceuticals |
NAICS | 541712 - Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology) |
SIC | 8731 - Commercial Physical Research |
Sales | <$500,000 |
# of Employees | 450 |
Plant Area (Sq.Ft.) | 350,000 |
Annual Production | 0 Units |
Production Hrs. Annual | 2,600 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $970,069 | 10,544,904 | kWh | $0.09 |
Electricity Demand | $323,985 | 21,200 | kW-months/year | $15.28 |
Natural Gas | $389,302 | 46,236 | MMBtu | $8.42 |
TOTAL ENERGY COSTS | $1,683,356 | |||
RECOMMENDED SAVINGS* | $231,093 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $33,234 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
Savings: $170,338 Cost: $792,300 |
$129,527 | 1,407,900 | $104,515 | 6,840 | $(-45,754) | (-5,434) | $(-17,950) | - |
$129,527 1,407,900 kWh |
$104,515 6,840 kW-months/year |
$(-45,754) (-5,434) MMBtu |
$(-17,950) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY |
Savings: $27,521 Cost: - |
$22,402 | 243,494 | $5,119 | 335 | - | - | - | - |
$22,402 243,494 kWh |
$5,119 335 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE |
Savings: $16,633 Cost: - |
$16,633 | 180,796 | - | - | - | - | - | - |
$16,633 180,796 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $10,124 Cost: $15,000 |
- | - | - | - | $10,124 | 1,202 | - | - |
- - kWh |
- - kW-months/year |
$10,124 1,202 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE |
Savings: $1,208 Cost: - |
- | - | - | - | $1,208 | 144 | - | - |
- - kWh |
- - kW-months/year |
$1,208 144 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $2,957 Cost: $384 |
$2,957 | 32,140 | - | - | - | - | - | - |
$2,957 32,140 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,312 Cost: $6,160 |
$1,533 | 16,661 | $779 | 51 | - | - | - | - |
$1,533 16,661 kWh |
$779 51 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $231,093 Cost: $813,844 |
$173,052 | 1,880,991 | $110,413 | 7,226 | $(-34,422) | (-4,088) | $(-17,950) | - | $173,052 1,880,991 kWh |
$110,413 7,226 kW-months/year |
$(-34,422) (-4,088) MMBtu |
$(-17,950) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $33,234 Cost: $21,544 |
$21,123 | 229,597 | $779 | 51 | $11,332 | 1,346 | - | - | $21,123 229,597 kWh |
$779 51 kW-months/year |
$11,332 1,346 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | One-time Revenue or Avoided Cost |