IAC Assessment: SD0404
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0404
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2008
Principal Product Metal Filing Cabinets
NAICS 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 110,000
Annual Production 20,000,000 Units
Production Hrs. Annual 2,250
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $125,155 1,312,616 kWh $0.10
Electricity Demand $65,469 3,588 kW-months/year $18.25
Natural Gas $126,010 15,388 MMBtu $8.19
TOTAL ENERGY COSTS $316,634
RECOMMENDED SAVINGS* $112,240 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,090
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,578
Cost:
-
$4,578 7,091 - - - - $4,578
7,091
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$18,544
Cost:
$29,161
$12,542 131,539 $6,002 329 - - $12,542
131,539
kWh
$6,002
329
kW-months/year
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$14,356
Cost:
$8,130
$9,282 97,397 $5,074 278 - - $9,282
97,397
kWh
$5,074
278
kW-months/year
-
-
MMBtu
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,382
Cost:
$4,270
- - - - $1,382 169 -
-
kWh
-
-
kW-months/year
$1,382
169
MMBtu
05: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$1,071
Cost:
$2,035
- - - - $1,071 144 -
-
kWh
-
-
kW-months/year
$1,071
144
MMBtu
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,452
Cost:
$2,144
$1,649 17,296 $803 44 - - $1,649
17,296
kWh
$803
44
kW-months/year
-
-
MMBtu
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,750
Cost:
$5,772
$1,750 18,359 - - - - $1,750
18,359
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,928
Cost:
$3,189
$1,304 13,680 $624 34 - - $1,304
13,680
kWh
$624
34
kW-months/year
-
-
MMBtu
09: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$62,662
Cost:
$213,472
$30,435 319,200 $17,520 960 $14,707 1,796 $30,435
319,200
kWh
$17,520
960
kW-months/year
$14,707
1,796
MMBtu
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,517
Cost:
$720
$2,276 23,880 $1,241 68 - - $2,276
23,880
kWh
$1,241
68
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$112,240
Cost:
$268,893
$63,816 628,442 $31,264 1,713 $17,160 2,109 $63,816
628,442
kWh
$31,264
1,713
kW-months/year
$17,160
2,109
MMBtu
TOTAL IMPLEMENTED Savings:
$32,090
Cost:
$37,249
$22,349 193,486 $8,670 475 $1,071 144 $22,349
193,486
kWh
$8,670
475
kW-months/year
$1,071
144
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas