IAC logo
IAC Assessment: SD0405
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0405
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2008
Principal Product Newspaper Printing Plates
NAICS 323120 - Support Activities for Printing
SIC 2672 - Paper Coated And Laminated, Nec
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 185,000
Annual Production 6,000,000 Pieces
Production Hrs. Annual 7,200
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $366,374 4,526,567 kWh $0.08
Electricity Demand $191,931 29,952 kW-months/year $6.41
Electricity Fees $66,701 - $ -
Natural Gas $222,747 25,832 MMBtu $8.62
TOTAL ENERGY COSTS $847,753
RECOMMENDED SAVINGS* $226,344 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $217,227
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$117,665
Cost:
$1,117,600
$78,590 3,474,720 $39,075 6,096 - - $78,590
3,474,720
kWh
$39,075
6,096
kW-months/year
-
-
MMBtu
02: 2.5111 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS Savings:
$62,965
Cost:
$69,500
- - - - $62,965 7,310 -
-
kWh
-
-
kW-months/year
$62,965
7,310
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$16,824
Cost:
$22,665
$14,850 183,561 $1,974 308 - - $14,850
183,561
kWh
$1,974
308
kW-months/year
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,507
Cost:
$900
$10,165 125,651 $1,342 209 - - $10,165
125,651
kWh
$1,342
209
kW-months/year
-
-
MMBtu
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$7,660
Cost:
$4,270
- - - - $7,660 889 -
-
kWh
-
-
kW-months/year
$7,660
889
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,270
Cost:
$4,650
$5,270 65,152 - - - - $5,270
65,152
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,436
Cost:
$3,324
$2,436 30,112 - - - - $2,436
30,112
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,411
Cost:
$3,110
$1,244 15,380 $167 26 - - $1,244
15,380
kWh
$167
26
kW-months/year
-
-
MMBtu
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$606
Cost:
$256
$606 7,349 - - - - $606
7,349
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$226,344
Cost:
$1,226,275
$113,161 3,901,925 $42,558 6,639 $70,625 8,199 $113,161
3,901,925
kWh
$42,558
6,639
kW-months/year
$70,625
8,199
MMBtu
TOTAL IMPLEMENTED Savings:
$217,227
Cost:
$1,215,191
$104,211 3,791,281 $42,391 6,613 $70,625 8,199 $104,211
3,791,281
kWh
$42,391
6,613
kW-months/year
$70,625
8,199
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas