IAC logo
IAC Assessment: SD0406
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0406
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2008
Principal Product Fiber and Plastic Drums
NAICS 322219 - Other Paperboard Container Manufacturing
SIC 2655 - Fiber Cans, Drums & Similar Products
Sales $5,000,000-$10,000,000
# of Employees 35
Plant Area (Sq.Ft.) 75,000
Annual Production 750,000,000 Pieces
Production Hrs. Annual 6,200
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $149,147 1,635,579 kWh $0.09
Electricity Demand $90,117 5,488 kW-months/year $16.42
Electricity Fees $14,973 - $ -
Natural Gas $2,948 228 MMBtu $12.93
TOTAL ENERGY COSTS $257,185
RECOMMENDED SAVINGS* $28,525 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,268
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,805
Cost:
$48,176
$9,193 101,024 $3,612 220 $9,193
101,024
kWh
$3,612
220
kW-months/year
02: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$9,257
Cost:
$1,026
$5,514 59,871 $3,743 228 $5,514
59,871
kWh
$3,743
228
kW-months/year
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,830
Cost:
$3,110
$1,403 15,380 $427 26 $1,403
15,380
kWh
$427
26
kW-months/year
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,339
Cost:
$6,365
$2,339 25,643 - - $2,339
25,643
kWh
-
-
kW-months/year
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,294
Cost:
$1,477
$1,374 15,100 $920 56 $1,374
15,100
kWh
$920
56
kW-months/year
TOTAL RECOMMENDED Savings:
$28,525
Cost:
$60,154
$19,823 217,018 $8,702 530 $19,823
217,018
kWh
$8,702
530
kW-months/year
TOTAL IMPLEMENTED Savings:
$19,268
Cost:
$59,128
$14,309 157,147 $4,959 302 $14,309
157,147
kWh
$4,959
302
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand