IAC Assessment: SD0413
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0413
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2009
Principal Product Biopharmaceuticals
NAICS 325414 - Biological Product (except Diagnostic) Manufacturing
SIC 2836 - Biological Products Exc. Diagnostic
Sales $100,000,000-$500,000,000
# of Employees 633
Plant Area (Sq.Ft.) 274,364
Annual Production 1,000,000,000 Units
Production Hrs. Annual 4,800
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $558,011 6,978,347 kWh $0.08
Electricity Demand $238,069 13,602 kW-months/year $17.50
Electricity Fees $12,109 - $ -
Natural Gas $874,011 90,357 MMBtu $9.67
TOTAL ENERGY COSTS $1,944,781
RECOMMENDED SAVINGS* $370,368 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $188,393
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$151,192
Cost:
$1,125,000
$332,880 4,161,000 $105,015 6,000 $(-37,479) - $(-249,224) (-257,650) - - $332,880
4,161,000
kWh
$105,015
6,000
kW-months/year
$(-37,479)
-
$
$(-249,224)
(-257,650)
MMBtu
-
-
Tgal
02: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$57,036
Cost:
$120,000
$33,256 415,698 $23,780 1,359 - - - - - - $33,256
415,698
kWh
$23,780
1,359
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
03: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$31,920
Cost:
$13,200
$24,017 300,219 $7,903 452 - - - - - - $24,017
300,219
kWh
$7,903
452
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$27,991
Cost:
$20,850
$27,991 349,885 - - - - - - - - $27,991
349,885
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$26,118
Cost:
$9,600
$11,063 138,282 - - - - - - $15,055 4,854,520 $11,063
138,282
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$15,055
4,854,520
Tgal
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$17,623
Cost:
$13,300
$17,623 220,284 - - - - - - - - $17,623
220,284
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
07: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$16,800
Cost:
$2,000
$16,800 168,000 - - - - - - - - $16,800
168,000
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$10,905
Cost:
$13,511
$8,253 103,158 $2,652 152 - - - - - - $8,253
103,158
kWh
$2,652
152
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
09: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$25,825
Cost:
$17,794
$(-2,241) (-28,007) $(-671) (-38) - - $28,737 2,971 - - $(-2,241)
(-28,007)
kWh
$(-671)
(-38)
kW-months/year
-
-
$
$28,737
2,971
MMBtu
-
-
Tgal
10: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,202
Cost:
-
$2,202 27,529 - - - - - - - - $2,202
27,529
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
11: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$1,764
Cost:
$1,725
$1,764 22,052 - - - - - - - - $1,764
22,052
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
12: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$992
Cost:
-
- - - - $992 - - - - - -
-
kWh
-
-
kW-months/year
$992
-
$
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$370,368
Cost:
$1,336,980
$473,608 5,878,100 $138,679 7,925 $(-36,487) - $(-220,487) (-254,679) $15,055 4,854,520 $473,608
5,878,100
kWh
$138,679
7,925
kW-months/year
$(-36,487)
-
$
$(-220,487)
(-254,679)
MMBtu
$15,055
4,854,520
Tgal
TOTAL IMPLEMENTED Savings:
$188,393
Cost:
$192,461
$139,003 1,695,526 $34,335 1,963 - - - - $15,055 4,854,520 $139,003
1,695,526
kWh
$34,335
1,963
kW-months/year
-
-
$
-
-
MMBtu
$15,055
4,854,520
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal