IAC logo
IAC Assessment: SD0415
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0415
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2009
Principal Product Optical Rotary Encoders
NAICS 335314 - Relay and Industrial Control Manufacturing
SIC 3625 - Relays And Industrial Controls
Sales $10,000,000-$50,000,000
# of Employees 72
Plant Area (Sq.Ft.) 33,600
Annual Production 275,000 Pieces
Production Hrs. Annual 1,700
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $86,549 968,284 kWh $0.09
Electricity Demand $50,360 2,895 kW-months/year $17.40
Electricity Fees $4,545 - $ -
Natural Gas $3,296 278 MMBtu $11.86
TOTAL ENERGY COSTS $144,750
RECOMMENDED SAVINGS* $18,418 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,611
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$6,503
Cost:
$18,750
$6,503 45,990 - - - - $6,503
45,990
kWh
-
-
kW-months/year
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,780
Cost:
$7,974
$4,780 53,465 - - - - $4,780
53,465
kWh
-
-
kW-months/year
-
-
$
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$3,009
Cost:
-
$3,009 33,662 - - - - $3,009
33,662
kWh
-
-
kW-months/year
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,047
Cost:
-
- - - - $1,047 - -
-
kWh
-
-
kW-months/year
$1,047
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,035
Cost:
$128
$451 5,040 $584 34 - - $451
5,040
kWh
$584
34
kW-months/year
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$910
Cost:
$1,000
$910 10,174 - - - - $910
10,174
kWh
-
-
kW-months/year
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$657
Cost:
$5,864
$340 3,802 $317 18 - - $340
3,802
kWh
$317
18
kW-months/year
-
-
$
08: 2.7145 INSTALL SKYLIGHTS Savings:
$323
Cost:
$1,470
$323 3,611 - - - - $323
3,611
kWh
-
-
kW-months/year
-
-
$
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$154
Cost:
$347
$154 1,727 - - - - $154
1,727
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$18,418
Cost:
$35,533
$16,470 157,471 $901 52 $1,047 - $16,470
157,471
kWh
$901
52
kW-months/year
$1,047
-
$
TOTAL IMPLEMENTED Savings:
$11,611
Cost:
$20,225
$11,027 96,593 $584 34 - - $11,027
96,593
kWh
$584
34
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $