IAC Assessment: SD0451
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0451
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2012
Principal Product Reclaimed Water
NAICS 221310 - Water Supply and Irrigation Systems
SIC 4952 - Sewerage Systems
Sales $1,000,000-$5,000,000
# of Employees 33
Plant Area (Sq.Ft.) 20,000
Annual Production 2,500,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $385,457 7,651,400 kWh $0.05
Electricity Demand $228,141 12,774 kW-months/year $17.86
Electricity Fees $7,792 - $ -
Natural Gas $39,327 4,111 MMBtu $9.57
TOTAL ENERGY COSTS $660,717
RECOMMENDED SAVINGS* $198,327 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,972
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.1336 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL Savings:
$35,395
Cost:
$14,332
- - - - $35,395 3,700 - - -
-
kWh
-
-
kW-months/year
$35,395
3,700
MMBtu
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$23,815
Cost:
$17,500
$16,035 318,160 $7,780 435 - - - - $16,035
318,160
kWh
$7,780
435
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$1,577
Cost:
$2,373
$1,577 31,300 - - - - - - $1,577
31,300
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$3,240
Cost:
$9,000
$3,240 64,285 - - - - - - $3,240
64,285
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$134,300
Cost:
$455,000
$75,600 1,500,000 $35,700 2,000 $38,000 4,000 $(-15,000) - $75,600
1,500,000
kWh
$35,700
2,000
kW-months/year
$38,000
4,000
MMBtu
$(-15,000)
-
$
TOTAL RECOMMENDED Savings:
$198,327
Cost:
$498,205
$96,452 1,913,745 $43,480 2,435 $73,395 7,700 $(-15,000) - $96,452
1,913,745
kWh
$43,480
2,435
kW-months/year
$73,395
7,700
MMBtu
$(-15,000)
-
$
TOTAL IMPLEMENTED Savings:
$36,972
Cost:
$16,705
$1,577 31,300 - - $35,395 3,700 - - $1,577
31,300
kWh
-
-
kW-months/year
$35,395
3,700
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes