IAC logo
IAC Assessment: SD0452
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0452
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2012
Principal Product Treated Water
NAICS 221310 - Water Supply and Irrigation Systems
SIC 4952 - Sewerage Systems
Sales $10,000,000-$50,000,000
# of Employees 13
Plant Area (Sq.Ft.) 2,560,000
Annual Production 11,500 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,045,469 11,979,368 kWh $0.09
Electricity Demand $388,588 25,575 kW-months/year $15.19
Electricity Fees $11,590 - $ -
Natural Gas $257,486 46,277 MMBtu $5.56
TOTAL ENERGY COSTS $1,703,133
RECOMMENDED SAVINGS* $187,969 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $177,897
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.1336 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL Savings:
$48,619
Cost:
$2,000
- - - - $48,619 8,738 - - -
-
kWh
-
-
kW-months/year
$48,619
8,738
MMBtu
-
-
$
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$24,957
Cost:
$15,925
$19,170 219,585 $5,787 381 - - - - $19,170
219,585
kWh
$5,787
381
kW-months/year
-
-
MMBtu
-
-
$
03: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$10,072
Cost:
$18,680
$8,128 93,104 $1,944 128 - - - - $8,128
93,104
kWh
$1,944
128
kW-months/year
-
-
MMBtu
-
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,223
Cost:
$4,200
- - - - $2,223 400 - - -
-
kWh
-
-
kW-months/year
$2,223
400
MMBtu
-
-
$
05: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$102,098
Cost:
$275,000
$65,475 750,000 $15,190 1,000 $28,933 5,200 $(-7,500) - $65,475
750,000
kWh
$15,190
1,000
kW-months/year
$28,933
5,200
MMBtu
$(-7,500)
-
$
TOTAL RECOMMENDED Savings:
$187,969
Cost:
$315,805
$92,773 1,062,689 $22,922 1,509 $79,775 14,338 $(-7,500) - $92,773
1,062,689
kWh
$22,922
1,509
kW-months/year
$79,775
14,338
MMBtu
$(-7,500)
-
$
TOTAL IMPLEMENTED Savings:
$177,897
Cost:
$297,125
$84,645 969,585 $20,977 1,381 $79,775 14,338 $(-7,500) - $84,645
969,585
kWh
$20,977
1,381
kW-months/year
$79,775
14,338
MMBtu
$(-7,500)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes