IAC Assessment: SD0457
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0457
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2012
Principal Product Pork Products
NAICS 311611 - Animal (except Poultry) Slaughtering
SIC 2013 - Sausages And Other Prepared Meats
Sales $100,000,000-$500,000,000
# of Employees 1,100
Plant Area (Sq.Ft.) 750,000
Annual Production 1,260,000 Pounds
Production Hrs. Annual 6,656
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $4,262,590 63,102,104 kWh $0.07
Electricity Demand $1,695,681 138,279 kW-months/year $12.26
Electricity Fees $181,782 - $ -
Natural Gas $1,609,192 319,883 MMBtu $5.03
TOTAL ENERGY COSTS $7,749,245
RECOMMENDED SAVINGS* $395,794 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $146,375
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$111,057
Cost:
$145,000
$88,955 1,315,906 $22,102 1,803 - - $88,955
1,315,906
kWh
$22,102
1,803
kW-months/year
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$77,740
Cost:
$9,900
$62,269 921,134 $15,471 1,262 - - $62,269
921,134
kWh
$15,471
1,262
kW-months/year
-
-
MMBtu
03: 2.1223 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) Savings:
$66,646
Cost:
$142,500
- - - - $66,646 13,247 -
-
kWh
-
-
kW-months/year
$66,646
13,247
MMBtu
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$46,364
Cost:
$89,136
- - - - $46,364 9,216 -
-
kWh
-
-
kW-months/year
$46,364
9,216
MMBtu
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$35,157
Cost:
$30,000
$26,096 386,034 $9,061 739 - - $26,096
386,034
kWh
$9,061
739
kW-months/year
-
-
MMBtu
06: 2.4134 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE Savings:
$17,875
Cost:
$33,000
$26,447 391,222 $13,813 1,127 $(-22,385) (-4,450) $26,447
391,222
kWh
$13,813
1,127
kW-months/year
$(-22,385)
(-4,450)
MMBtu
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$17,316
Cost:
$50,240
$14,378 212,694 $2,938 240 - - $14,378
212,694
kWh
$2,938
240
kW-months/year
-
-
MMBtu
08: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$11,926
Cost:
$35,500
$2,649 - $9,277 - - - $2,649
-
kWh
$9,277
-
kW-months/year
-
-
MMBtu
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,169
Cost:
$10,385
$3,339 49,392 $830 68 - - $3,339
49,392
kWh
$830
68
kW-months/year
-
-
MMBtu
10: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,722
Cost:
$871
- - - - $2,722 541 -
-
kWh
-
-
kW-months/year
$2,722
541
MMBtu
11: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$2,233
Cost:
$200
- - - - $2,233 444 -
-
kWh
-
-
kW-months/year
$2,233
444
MMBtu
12: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$1,808
Cost:
$200
$1,093 16,161 $715 58 - - $1,093
16,161
kWh
$715
58
kW-months/year
-
-
MMBtu
13: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE Savings:
$781
Cost:
$200
- - - - $781 155 -
-
kWh
-
-
kW-months/year
$781
155
MMBtu
TOTAL RECOMMENDED Savings:
$395,794
Cost:
$547,132
$225,226 3,292,543 $74,207 5,296 $96,361 19,153 $225,226
3,292,543
kWh
$74,207
5,296
kW-months/year
$96,361
19,153
MMBtu
TOTAL IMPLEMENTED Savings:
$146,375
Cost:
$150,347
$76,647 1,133,828 $18,409 1,502 $51,319 10,201 $76,647
1,133,828
kWh
$18,409
1,502
kW-months/year
$51,319
10,201
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas