Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2012 |
Principal Product | Pork Products |
NAICS | 311611 - Animal (except Poultry) Slaughtering |
SIC | 2013 - Sausages And Other Prepared Meats |
Sales | $100,000,000-$500,000,000 |
# of Employees | 1,100 |
Plant Area (Sq.Ft.) | 750,000 |
Annual Production | 1,260,000 Pounds |
Production Hrs. Annual | 6,656 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $4,262,590 | 63,102,104 | kWh | $0.07 |
Electricity Demand | $1,695,681 | 138,279 | kW-months/year | $12.26 |
Electricity Fees | $181,782 | - | $ | - |
Natural Gas | $1,609,192 | 319,883 | MMBtu | $5.03 |
TOTAL ENERGY COSTS | $7,749,245 | |||
RECOMMENDED SAVINGS* | $395,794 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $146,375 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4321 UPGRADE OBSOLETE EQUIPMENT |
Savings: $111,057 Cost: $145,000 |
$88,955 | 1,315,906 | $22,102 | 1,803 | - | - |
$88,955 1,315,906 kWh |
$22,102 1,803 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $77,740 Cost: $9,900 |
$62,269 | 921,134 | $15,471 | 1,262 | - | - |
$62,269 921,134 kWh |
$15,471 1,262 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1223 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) |
Savings: $66,646 Cost: $142,500 |
- | - | - | - | $66,646 | 13,247 |
- - kWh |
- - kW-months/year |
$66,646 13,247 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $46,364 Cost: $89,136 |
- | - | - | - | $46,364 | 9,216 |
- - kWh |
- - kW-months/year |
$46,364 9,216 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $35,157 Cost: $30,000 |
$26,096 | 386,034 | $9,061 | 739 | - | - |
$26,096 386,034 kWh |
$9,061 739 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4134 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE |
Savings: $17,875 Cost: $33,000 |
$26,447 | 391,222 | $13,813 | 1,127 | $(-22,385) | (-4,450) |
$26,447 391,222 kWh |
$13,813 1,127 kW-months/year |
$(-22,385) (-4,450) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $17,316 Cost: $50,240 |
$14,378 | 212,694 | $2,938 | 240 | - | - |
$14,378 212,694 kWh |
$2,938 240 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS |
Savings: $11,926 Cost: $35,500 |
$2,649 | - | $9,277 | - | - | - |
$2,649 - kWh |
$9,277 - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $4,169 Cost: $10,385 |
$3,339 | 49,392 | $830 | 68 | - | - |
$3,339 49,392 kWh |
$830 68 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $2,722 Cost: $871 |
- | - | - | - | $2,722 | 541 |
- - kWh |
- - kW-months/year |
$2,722 541 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $2,233 Cost: $200 |
- | - | - | - | $2,233 | 444 |
- - kWh |
- - kW-months/year |
$2,233 444 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT |
Savings: $1,808 Cost: $200 |
$1,093 | 16,161 | $715 | 58 | - | - |
$1,093 16,161 kWh |
$715 58 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE |
Savings: $781 Cost: $200 |
- | - | - | - | $781 | 155 |
- - kWh |
- - kW-months/year |
$781 155 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $395,794 Cost: $547,132 |
$225,226 | 3,292,543 | $74,207 | 5,296 | $96,361 | 19,153 | $225,226 3,292,543 kWh |
$74,207 5,296 kW-months/year |
$96,361 19,153 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $146,375 Cost: $150,347 |
$76,647 | 1,133,828 | $18,409 | 1,502 | $51,319 | 10,201 | $76,647 1,133,828 kWh |
$18,409 1,502 kW-months/year |
$51,319 10,201 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |