Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2012 |
Principal Product | Pork Products |
NAICS | 311611 - Animal (except Poultry) Slaughtering |
SIC | 2013 - Sausages And Other Prepared Meats |
Sales | $100,000,000-$500,000,000 |
# of Employees | 643 |
Plant Area (Sq.Ft.) | 450,000 |
Annual Production | 740,000 Pounds |
Production Hrs. Annual | 6,240 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,447,947 | 18,764,159 | kWh | $0.08 |
Electricity Demand | $737,449 | 55,593 | kW-months/year | $13.27 |
Electricity Fees | $65,990 | - | $ | - |
Natural Gas | $392,692 | 70,446 | MMBtu | $5.57 |
TOTAL ENERGY COSTS | $2,644,078 | |||
RECOMMENDED SAVINGS* | $392,678 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $11,667 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.5194 REDESIGN PROCESS |
Savings: $272,976 Cost: $164,279 |
$(-7,568) | (-98,035) | $(-1,782) | (-134) | $150,926 | 27,077 | $131,400 | 29,200,000 |
$(-7,568) (-98,035) kWh |
$(-1,782) (-134) kW-months/year |
$150,926 27,077 MMBtu |
$131,400 29,200,000 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1223 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) |
Savings: $46,732 Cost: $123,300 |
- | - | - | - | $46,732 | 8,384 | - | - |
- - kWh |
- - kW-months/year |
$46,732 8,384 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $29,502 Cost: $58,740 |
$25,377 | 328,718 | $4,125 | 311 | - | - | - | - |
$25,377 328,718 kWh |
$4,125 311 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $22,833 Cost: $11,000 |
- | - | - | - | $22,833 | 4,096 | - | - |
- - kWh |
- - kW-months/year |
$22,833 4,096 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $11,667 Cost: $34,450 |
$8,768 | 113,579 | $2,899 | 219 | - | - | - | - |
$8,768 113,579 kWh |
$2,899 219 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $7,861 Cost: $8,422 |
- | - | - | - | $7,861 | 1,410 | - | - |
- - kWh |
- - kW-months/year |
$7,861 1,410 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE |
Savings: $1,107 Cost: $200 |
- | - | - | - | $1,107 | 199 | - | - |
- - kWh |
- - kW-months/year |
$1,107 199 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $392,678 Cost: $400,391 |
$26,577 | 344,262 | $5,242 | 395 | $229,459 | 41,166 | $131,400 | 29,200,000 | $26,577 344,262 kWh |
$5,242 395 kW-months/year |
$229,459 41,166 MMBtu |
$131,400 29,200,000 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $11,667 Cost: $34,450 |
$8,768 | 113,579 | $2,899 | 219 | - | - | - | - | $8,768 113,579 kWh |
$2,899 219 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal |