IAC logo
IAC Assessment: SD0460
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0460
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2013
Principal Product Laser Tables
NAICS 333314 - Optical Instrument and Lens Manufacturing
SIC 3827 - Optical Instruments And Lenses
Sales $500,000-$1,000,000
# of Employees 400
Plant Area (Sq.Ft.) 213,000
Annual Production 10,000 Pieces
Production Hrs. Annual 4,250
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $591,880 7,517,592 kWh $0.08
Electricity Demand $194,013 16,461 kW-months/year $11.79
Natural Gas $45,644 6,411 MMBtu $7.12
TOTAL ENERGY COSTS $831,537
RECOMMENDED SAVINGS* $127,513 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $69,180
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$50,132
Cost:
$152,300
$40,555 512,322 $9,577 812 - - $40,555
512,322
kWh
$9,577
812
kW-months/year
-
-
MMBtu
02: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$48,502
Cost:
$119,500
$48,502 616,291 - - - - $48,502
616,291
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$11,357
Cost:
$1,000
$11,357 282,505 - - - - $11,357
282,505
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,875
Cost:
$900
$2,334 29,661 $1,541 131 - - $2,334
29,661
kWh
$1,541
131
kW-months/year
-
-
MMBtu
05: 2.1224 REPLACE BOILER Savings:
$4,735
Cost:
$14,250
- - - - $4,735 673 -
-
kWh
-
-
kW-months/year
$4,735
673
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,847
Cost:
$7,050
$3,847 48,878 - - - - $3,847
48,878
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,515
Cost:
$3,212
$1,257 15,977 $258 22 - - $1,257
15,977
kWh
$258
22
kW-months/year
-
-
MMBtu
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,570
Cost:
$200
$1,570 19,946 - - - - $1,570
19,946
kWh
-
-
kW-months/year
-
-
MMBtu
09: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,249
Cost:
$1,100
$878 11,156 $371 32 - - $878
11,156
kWh
$371
32
kW-months/year
-
-
MMBtu
10: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$731
Cost:
$2,500
$518 6,588 $213 18 - - $518
6,588
kWh
$213
18
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$127,513
Cost:
$302,012
$110,818 1,543,324 $11,960 1,014 $4,735 673 $110,818
1,543,324
kWh
$11,960
1,014
kW-months/year
$4,735
673
MMBtu
TOTAL IMPLEMENTED Savings:
$69,180
Cost:
$160,112
$57,591 866,999 $11,589 983 - - $57,591
866,999
kWh
$11,589
983
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas