IAC logo
IAC Assessment: SD0462
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0462
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2013
Principal Product Aircraft Components
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $100,000,000-$500,000,000
# of Employees 400
Plant Area (Sq.Ft.) 1,133,000
Annual Production 1,000 Pieces
Production Hrs. Annual 8,568
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,531,006 23,340,626 kWh $0.07
Electricity Demand $965,798 47,702 kW-months/year $20.25
Electricity Fees $135,644 - $ -
Natural Gas $450,068 106,502 MMBtu $4.23
TOTAL ENERGY COSTS $3,082,516
RECOMMENDED SAVINGS* $187,374 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4134 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE Savings:
$99,584
Cost:
$283,600
$92,384 1,408,293 $74,888 3,698 $(-67,688) (-16,017) $92,384
1,408,293
kWh
$74,888
3,698
kW-months/year
$(-67,688)
(-16,017)
MMBtu
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$21,686
Cost:
$36,750
$15,734 239,833 $5,952 294 - - $15,734
239,833
kWh
$5,952
294
kW-months/year
-
-
MMBtu
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$19,741
Cost:
$18,500
- - - - $19,741 4,671 -
-
kWh
-
-
kW-months/year
$19,741
4,671
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$16,726
Cost:
$2,000
$9,238 140,830 $7,488 370 - - $9,238
140,830
kWh
$7,488
370
kW-months/year
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$13,368
Cost:
$32,235
$10,996 167,621 $2,372 117 - - $10,996
167,621
kWh
$2,372
117
kW-months/year
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,034
Cost:
$20,023
$8,400 128,049 $3,634 179 - - $8,400
128,049
kWh
$3,634
179
kW-months/year
-
-
MMBtu
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,503
Cost:
$4,225
$2,503 38,162 - - - - $2,503
38,162
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,732
Cost:
$2,035
$1,363 20,777 $369 18 - - $1,363
20,777
kWh
$369
18
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$187,374
Cost:
$399,368
$140,618 2,143,565 $94,703 4,677 $(-47,947) (-11,346) $140,618
2,143,565
kWh
$94,703
4,677
kW-months/year
$(-47,947)
(-11,346)
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas