IAC logo
IAC Assessment: SD0476
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0476
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2013
Principal Product Recycled water
NAICS 221310 - Water Supply and Irrigation Systems
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 25
Plant Area (Sq.Ft.) 200,000
Annual Production 1,000,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $197,533 2,791,582 kWh $0.07
Electricity Demand $104,171 6,210 kW-months/year $16.77
Natural Gas $13,749 2,646 MMBtu $5.20
TOTAL ENERGY COSTS $315,453
RECOMMENDED SAVINGS* $116,563 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,340
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR Savings:
$78,108
Cost:
$360,000
$70,704 998,640 $21,734 1,296 $(-19,973) - $5,643 1,085 $70,704
998,640
kWh
$21,734
1,296
kW-months/year
$(-19,973)
-
$
$5,643
1,085
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$23,282
Cost:
$33,000
$18,404 259,945 $4,878 291 - - - - $18,404
259,945
kWh
$4,878
291
kW-months/year
-
-
$
-
-
MMBtu
03: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$6,115
Cost:
$200
- - - - - - $6,115 1,176 -
-
kWh
-
-
kW-months/year
-
-
$
$6,115
1,176
MMBtu
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$5,485
Cost:
$13,830
$4,266 60,259 $1,219 73 - - - - $4,266
60,259
kWh
$1,219
73
kW-months/year
-
-
$
-
-
MMBtu
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,573
Cost:
$6,995
$2,573 36,360 $1,000 60 - - - - $2,573
36,360
kWh
$1,000
60
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$116,563
Cost:
$414,025
$95,947 1,355,204 $28,831 1,719 $(-19,973) - $11,758 2,261 $95,947
1,355,204
kWh
$28,831
1,719
kW-months/year
$(-19,973)
-
$
$11,758
2,261
MMBtu
TOTAL IMPLEMENTED Savings:
$32,340
Cost:
$53,825
$25,243 356,564 $7,097 423 - - - - $25,243
356,564
kWh
$7,097
423
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas