IAC Assessment: SD0486
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0486
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2014
Principal Product aerospace clamps
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 255
Plant Area (Sq.Ft.) 88,000
Annual Production 100,000 Pieces
Production Hrs. Annual 5,434
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $259,309 3,386,554 kWh $0.08
Electricity Demand $246,981 9,979 kW-months/year $24.75
Electricity Fees $33,312 - $ -
Natural Gas $32,375 4,545 MMBtu $7.12
TOTAL ENERGY COSTS $571,977
RECOMMENDED SAVINGS* $191,062 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$75,586
Cost:
$286,300
$63,933 834,645 $11,653 461 $63,933
834,645
kWh
$11,653
461
kW-months/year
02: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$54,581
Cost:
$250,000
$37,904 494,828 $16,677 674 $37,904
494,828
kWh
$16,677
674
kW-months/year
03: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$29,967
Cost:
$30,993
$29,967 391,215 - - $29,967
391,215
kWh
-
-
kW-months/year
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$14,957
Cost:
$4,985
- - $14,957 427 -
-
kWh
$14,957
427
kW-months/year
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$13,274
Cost:
$22,000
$10,579 138,112 $2,695 109 $10,579
138,112
kWh
$2,695
109
kW-months/year
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,270
Cost:
$600
$1,674 21,855 $596 24 $1,674
21,855
kWh
$596
24
kW-months/year
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$427
Cost:
$600
$316 4,121 $111 5 $316
4,121
kWh
$111
5
kW-months/year
TOTAL RECOMMENDED Savings:
$191,062
Cost:
$595,478
$144,373 1,884,776 $46,689 1,699 $144,373
1,884,776
kWh
$46,689
1,699
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand