IAC Assessment: SD0492
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0492
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2014
Principal Product electrical transformers
NAICS 334416 - Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing
SIC 3679 - Electronic Components, Nec
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 50,000
Annual Production 750,000 Pieces
Production Hrs. Annual 6,240
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $225,871 2,293,102 kWh $0.10
Electricity Demand $101,626 8,527 kW-months/year $11.92
Electricity Fees $65,663 - $ -
Natural Gas $12,104 1,471 MMBtu $8.23
TOTAL ENERGY COSTS $405,264
RECOMMENDED SAVINGS* $176,500 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $23,181
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$153,319
Cost:
$210,684
$156,295 1,586,737 $52,720 4,423 $(-55,696) (-6,768) $156,295
1,586,737
kWh
$52,720
4,423
kW-months/year
$(-55,696)
(-6,768)
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,158
Cost:
$34,531
$12,272 124,569 $2,886 242 - - $12,272
124,569
kWh
$2,886
242
kW-months/year
-
-
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,880
Cost:
$1,527
$3,202 32,510 $678 57 - - $3,202
32,510
kWh
$678
57
kW-months/year
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,731
Cost:
$4,350
$2,512 25,500 $219 18 - - $2,512
25,500
kWh
$219
18
kW-months/year
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$881
Cost:
$1,791
$881 8,949 - - - - $881
8,949
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$531
Cost:
$400
$437 4,334 $94 8 - - $437
4,334
kWh
$94
8
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$176,500
Cost:
$253,283
$175,599 1,782,599 $56,597 4,748 $(-55,696) (-6,768) $175,599
1,782,599
kWh
$56,597
4,748
kW-months/year
$(-55,696)
(-6,768)
MMBtu
TOTAL IMPLEMENTED Savings:
$23,181
Cost:
$42,599
$19,304 195,862 $3,877 325 - - $19,304
195,862
kWh
$3,877
325
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas