IAC Assessment: SD0523
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0523
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2016
Principal Product Thermoset Compounds
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 35
Plant Area (Sq.Ft.) 72,000
Annual Production 493,364 Pounds
Production Hrs. Annual 2,210
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $80,916 651,342 kWh $0.12
Electricity Demand $60,622 3,778 kW-months/year $16.05
Electricity Fees $7,420 - $ -
TOTAL ENERGY COSTS $148,958
RECOMMENDED SAVINGS* $93,140 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $93,140
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $
01: 2.1336 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL Savings:
$38,152
Cost:
$147,781
$22,985 185,062 $15,167 945 - - $22,985
185,062
kWh
$15,167
945
kW-months/year
-
-
$
02: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$17,463
Cost:
$69,877
$14,850 119,567 $2,613 163 - - $14,850
119,567
kWh
$2,613
163
kW-months/year
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$16,883
Cost:
$11,174
$9,839 79,215 $7,044 439 - - $9,839
79,215
kWh
$7,044
439
kW-months/year
-
-
$
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$11,728
Cost:
$24,400
$6,833 55,022 $4,895 305 - - $6,833
55,022
kWh
$4,895
305
kW-months/year
-
-
$
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$3,236
Cost:
$1,000
- - $3,236 202 - - -
-
kWh
$3,236
202
kW-months/year
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,188
Cost:
$1,500
$1,408 11,337 $780 49 - - $1,408
11,337
kWh
$780
49
kW-months/year
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,341
Cost:
$700
$1,341 10,802 - - - - $1,341
10,802
kWh
-
-
kW-months/year
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,304
Cost:
$3,171
$680 5,473 $470 29 $154 - $680
5,473
kWh
$470
29
kW-months/year
$154
-
$
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$845
Cost:
$36
$492 3,963 $353 22 - - $492
3,963
kWh
$353
22
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$93,140
Cost:
$259,639
$58,428 470,441 $34,558 2,153 $154 - $58,428
470,441
kWh
$34,558
2,153
kW-months/year
$154
-
$
TOTAL IMPLEMENTED Savings:
$93,140
Cost:
$259,639
$58,428 470,441 $34,558 2,153 $154 - $58,428
470,441
kWh
$34,558
2,153
kW-months/year
$154
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost