IAC Assessment: SD0524
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0524
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2016
Principal Product Electronics testing platforms
NAICS 334515 - Instrument Manufacturing for Measuring and Testing Electricity and Electrical Signals
SIC 3825 - Instruments To Measure Electricity
Sales $100,000,000-$500,000,000
# of Employees 400
Plant Area (Sq.Ft.) 330,000
Annual Production 400 Pieces
Production Hrs. Annual 6,864
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $723,468 6,348,364 kWh $0.11
Electricity Demand $430,707 15,461 kW-months/year $27.86
Electricity Fees $4,407 - $ -
Natural Gas $7,280 902 MMBtu $8.07
TOTAL ENERGY COSTS $1,165,862
RECOMMENDED SAVINGS* $251,379 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,878
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $
01: 2.1336 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL Savings:
$116,648
Cost:
$532,759
$66,728 593,666 $49,920 1,792 - - $66,728
593,666
kWh
$49,920
1,792
kW-months/year
-
-
$
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$69,647
Cost:
$181,800
$41,529 369,476 $28,118 1,009 - - $41,529
369,476
kWh
$28,118
1,009
kW-months/year
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$14,569
Cost:
$4,000
$8,501 75,625 $6,068 218 - - $8,501
75,625
kWh
$6,068
218
kW-months/year
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,433
Cost:
$30,898
$10,438 92,868 $4,620 166 $(-625) - $10,438
92,868
kWh
$4,620
166
kW-months/year
$(-625)
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$13,124
Cost:
$7,975
$9,213 81,966 $3,911 140 - - $9,213
81,966
kWh
$3,911
140
kW-months/year
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$11,814
Cost:
$18,199
$8,727 77,645 $3,087 111 - - $8,727
77,645
kWh
$3,087
111
kW-months/year
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,363
Cost:
$800
$4,363 38,817 - - - - $4,363
38,817
kWh
-
-
kW-months/year
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,754
Cost:
$1,310
$3,754 33,393 - - - - $3,754
33,393
kWh
-
-
kW-months/year
-
-
$
09: 2.7292 LOWER CEILING TO REDUCE CONDITIONED SPACE Savings:
$2,073
Cost:
$5,877
$1,379 12,281 $694 25 - - $1,379
12,281
kWh
$694
25
kW-months/year
-
-
$
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$954
Cost:
$2,390
$954 8,487 - - - - $954
8,487
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$251,379
Cost:
$786,008
$155,586 1,384,224 $96,418 3,461 $(-625) - $155,586
1,384,224
kWh
$96,418
3,461
kW-months/year
$(-625)
-
$
TOTAL IMPLEMENTED Savings:
$16,878
Cost:
$9,285
$12,967 115,359 $3,911 140 - - $12,967
115,359
kWh
$3,911
140
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost