IAC Assessment: SD0525
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0525
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2016
Principal Product Metal Heat Treating
NAICS 332811 - Metal Heat Treating
SIC 3398 - Metal Heat Treating
Sales $10,000,000-$50,000,000
# of Employees 44
Plant Area (Sq.Ft.) 36,000
Annual Production 6,660 Pieces
Production Hrs. Annual 6,120
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $109,742 1,239,449 kWh $0.09
Electricity Demand $89,781 3,740 kW-months/year $24.01
Electricity Fees $7,325 - $ -
Natural Gas $113,008 73,688 MMBtu $1.53
TOTAL ENERGY COSTS $319,856
RECOMMENDED SAVINGS* $38,349 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$11,264
Cost:
$750
- - $11,264 755 - - - - -
-
kWh
$11,264
755
kW-months/year
-
-
MMBtu
-
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$10,754
Cost:
$16,450
- - - - $10,754 7,029 - - -
-
kWh
-
-
kW-months/year
$10,754
7,029
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,617
Cost:
$7,417
$2,212 24,997 $1,340 56 - - $65 - $2,212
24,997
kWh
$1,340
56
kW-months/year
-
-
MMBtu
$65
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,051
Cost:
$2,510
$2,004 22,630 $1,047 44 - - - - $2,004
22,630
kWh
$1,047
44
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$2,666
Cost:
$7,316
$2,087 23,578 $579 24 - - - - $2,087
23,578
kWh
$579
24
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,406
Cost:
$1,200
$1,570 17,736 $836 35 - - - - $1,570
17,736
kWh
$836
35
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,715
Cost:
$200
$1,715 19,376 - - - - - - $1,715
19,376
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,494
Cost:
$527
- - - - $1,494 977 - - -
-
kWh
-
-
kW-months/year
$1,494
977
MMBtu
-
-
$
09: 2.7134 USE PHOTOCELL CONTROLS Savings:
$847
Cost:
$1,480
$847 9,573 - - - - - - $847
9,573
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$535
Cost:
$144
$321 3,632 $214 9 - - - - $321
3,632
kWh
$214
9
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$38,349
Cost:
$37,994
$10,756 121,522 $15,280 922 $12,248 8,006 $65 - $10,756
121,522
kWh
$15,280
922
kW-months/year
$12,248
8,006
MMBtu
$65
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost