IAC logo
IAC Assessment: SD0542
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0542
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2017
Principal Product Store Fixtures
NAICS 337215 - Showcase, Partition, Shelving, and Locker Manufacturing
SIC 2542 - Partitions And Fixtures, Except Wood
Sales $10,000,000-$50,000,000
# of Employees 153
Plant Area (Sq.Ft.) 260,000
Annual Production 15,000 Units
Production Hrs. Annual 4,940
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $139,840 1,264,026 kWh $0.11
Electricity Demand $156,421 10,796 kW-months/year $14.49
Electricity Fees $(-107,254) - $ -
TOTAL ENERGY COSTS $189,007
RECOMMENDED SAVINGS* $49,917 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,705
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$17,070
Cost:
$9,000
$17,070 154,342 - - $17,070
154,342
kWh
-
-
kW-months/year
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$11,069
Cost:
$31,000
$8,355 75,541 $2,714 187 $8,355
75,541
kWh
$2,714
187
kW-months/year
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,743
Cost:
$11,288
$6,063 54,827 $680 47 $6,063
54,827
kWh
$680
47
kW-months/year
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,078
Cost:
$14,300
$5,078 45,917 - - $5,078
45,917
kWh
-
-
kW-months/year
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,740
Cost:
$1,500
$3,740 33,818 - - $3,740
33,818
kWh
-
-
kW-months/year
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,162
Cost:
$600
$2,162 19,546 - - $2,162
19,546
kWh
-
-
kW-months/year
07: 2.4234 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER Savings:
$1,935
Cost:
$1,833
$1,935 17,495 - - $1,935
17,495
kWh
-
-
kW-months/year
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,153
Cost:
$2,288
$870 7,870 $283 20 $870
7,870
kWh
$283
20
kW-months/year
09: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$967
Cost:
$850
$967 8,745 - - $967
8,745
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$49,917
Cost:
$72,659
$46,240 418,101 $3,677 254 $46,240
418,101
kWh
$3,677
254
kW-months/year
TOTAL IMPLEMENTED Savings:
$22,705
Cost:
$46,076
$19,028 172,056 $3,677 254 $19,028
172,056
kWh
$3,677
254
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand