IAC Assessment: SD0547
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0547
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2017
Principal Product Data Center Cabinets
NAICS 332510 - Hardware Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 38,000
Annual Production 9,000 Units
Production Hrs. Annual 6,240
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $100,736 878,920 kWh $0.11
Electricity Demand $39,164 2,877 kW-months/year $13.61
Electricity Fees $21,318 - $ -
Natural Gas $53,920 9,384 MMBtu $5.75
TOTAL ENERGY COSTS $215,138
RECOMMENDED SAVINGS* $17,183 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,712
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,853
Cost:
$20,582
$4,617 40,292 $1,082 79 - - $154 - $4,617
40,292
kWh
$1,082
79
kW-months/year
-
-
MMBtu
$154
-
$
02: 2.7134 USE PHOTOCELL CONTROLS Savings:
$3,679
Cost:
$11,568
$3,558 31,054 $121 9 - - - - $3,558
31,054
kWh
$121
9
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,165
Cost:
$1,500
$3,165 27,616 - - - - - - $3,165
27,616
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,746
Cost:
$2,045
$1,746 15,236 - - - - - - $1,746
15,236
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,326
Cost:
$750
$(-79) (-686) $(-33) (-2) $1,438 250 - - $(-79)
(-686)
kWh
$(-33)
(-2)
kW-months/year
$1,438
250
MMBtu
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$725
Cost:
$914
$725 6,322 - - - - - - $725
6,322
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$689
Cost:
$567
$558 4,868 $131 10 - - - - $558
4,868
kWh
$131
10
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$17,183
Cost:
$37,926
$14,290 124,702 $1,301 96 $1,438 250 $154 - $14,290
124,702
kWh
$1,301
96
kW-months/year
$1,438
250
MMBtu
$154
-
$
TOTAL IMPLEMENTED Savings:
$14,712
Cost:
$34,967
$11,819 103,144 $1,301 96 $1,438 250 $154 - $11,819
103,144
kWh
$1,301
96
kW-months/year
$1,438
250
MMBtu
$154
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost