IAC logo
IAC Assessment: SD0549
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0549
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2017
Principal Product Optical surgery equipment
NAICS 339112 - Surgical and Medical Instrument Manufacturing
SIC 3829 - Measuring & Controlling Devices, Nec
Sales <$500,000
# of Employees 350
Plant Area (Sq.Ft.) 185,760
Annual Production 80,001 Units
Production Hrs. Annual 3,120
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $892,019 10,021,278 kWh $0.09
Electricity Demand $493,311 22,179 kW-months/year $22.24
Electricity Fees $10,638 - $ -
Natural Gas $17,452 2,246 MMBtu $7.77
TOTAL ENERGY COSTS $1,413,420
RECOMMENDED SAVINGS* $68,390 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $68,390
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$49,288
Cost:
$204,000
$36,724 412,620 $12,564 565 - - - - $36,724
412,620
kWh
$12,564
565
kW-months/year
-
-
MMBtu
-
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$16,056
Cost:
$3,882
$14,772 165,524 $4,804 216 $(-3,520) (-453) - - $14,772
165,524
kWh
$4,804
216
kW-months/year
$(-3,520)
(-453)
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,048
Cost:
$4,352
$529 5,940 $507 23 - - $1,012 - $529
5,940
kWh
$507
23
kW-months/year
-
-
MMBtu
$1,012
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$638
Cost:
$600
$638 7,170 - - - - - - $638
7,170
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM Savings:
$360
Cost:
$300
$184 2,064 $176 8 - - - - $184
2,064
kWh
$176
8
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$68,390
Cost:
$213,134
$52,847 593,318 $18,051 812 $(-3,520) (-453) $1,012 - $52,847
593,318
kWh
$18,051
812
kW-months/year
$(-3,520)
(-453)
MMBtu
$1,012
-
$
TOTAL IMPLEMENTED Savings:
$68,390
Cost:
$213,134
$52,847 593,318 $18,051 812 $(-3,520) (-453) $1,012 - $52,847
593,318
kWh
$18,051
812
kW-months/year
$(-3,520)
(-453)
MMBtu
$1,012
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost