IAC Assessment: SD0553
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SD0553
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2017
Principal Product Electric guitars
NAICS 339992 - Musical Instrument Manufacturing
SIC 3931 - Musical Instruments
Sales $10,000,000-$50,000,000
# of Employees 400
Plant Area (Sq.Ft.) 166,000
Annual Production 183,600 Units
Production Hrs. Annual 7,344
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,061,154 8,552,830 kWh $0.12
Natural Gas $300,560 62,879 MMBtu $4.78
TOTAL ENERGY COSTS $1,361,714
RECOMMENDED SAVINGS* $123,979 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $52,041
#|Description Savings
Cost
Status Electricity Usage Ancillary Material Cost Electricity Usage Ancillary Material Cost
$ kWh $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$41,484
Cost:
$38,000
$41,484 334,277 - - $41,484
334,277
kWh
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$24,252
Cost:
$39,079
$24,252 190,459 - - $24,252
190,459
kWh
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$17,203
Cost:
$59,750
$17,203 138,629 - - $17,203
138,629
kWh
-
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$14,383
Cost:
$42,185
$14,383 115,895 - - $14,383
115,895
kWh
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$9,604
Cost:
$600
$9,604 77,389 - - $9,604
77,389
kWh
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,930
Cost:
$7,400
$6,930 55,845 - - $6,930
55,845
kWh
-
-
$
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$6,467
Cost:
$24,570
$9,880 79,611 $(-3,413) - $9,880
79,611
kWh
$(-3,413)
-
$
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,656
Cost:
$3,225
$3,656 29,460 - - $3,656
29,460
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$123,979
Cost:
$214,809
$127,392 1,021,565 $(-3,413) - $127,392
1,021,565
kWh
$(-3,413)
-
$
TOTAL IMPLEMENTED Savings:
$52,041
Cost:
$109,454
$52,041 414,393 - - $52,041
414,393
kWh
-
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Ancillary Material Cost Electricity Usage Ancillary Material Cost